Pennsylvania Code
Title 25 - ENVIRONMENTAL PROTECTION
Part I - Department of Environmental Protection
Subpart D - Environmental Health and Safety
Article IX - Residual Waste Management
Chapter 297 - INCINERATORS AND OTHER PROCESSING FACILITIES
Subchapter C - OPERATING REQUIREMENTS FOR PROCESSING FACILITIES
SOIL AND WATER PROTECTION
Section 297.232 - Soil erosion and sedimentation control

Universal Citation: 25 PA Code ยง 297.232

Current through Register Vol. 54, No. 44, November 2, 2024

The operator shall manage surface water and control erosion and sedimentation to:

(1) Divert surface water away from the storage area with measures and structures necessary to handle surface water flows, based on a 25-year, 24-hour precipitation event, and supported by written calculations and also in compliance with Chapter 102 (relating to erosion and sediment control).

(2) Meet the requirements of Chapter 102 and Chapter 105 (relating to dam safety and waterway management).

(3) Prevent erosion to the maximum extent possible, including if possible, using revegetation.

This section cited in 25 Pa. Code § 297.106 (relating to soil erosion and sedimentation control plan).

Disclaimer: These regulations may not be the most recent version. Pennsylvania may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.