Pennsylvania Code
Title 25 - ENVIRONMENTAL PROTECTION
Part I - Department of Environmental Protection
Subpart D - Environmental Health and Safety
Article IX - Residual Waste Management
Chapter 295 - COMPOSTING FACILITIES FOR RESIDUAL WASTE
Subchapter B - APPLICATION REQUIREMENTS FOR COMPOSTING FACILITIES
OPERATIONS
Section 295.111 - Operating plan
Current through Register Vol. 54, No. 44, November 2, 2024
An application to operate a composting facility shall contain the following:
(1) A narrative description of the general operating plan for the proposed facility, including the origin, composition and weight or volume of solid waste that is proposed to be composted at the facility, the suitability of the waste for composting, the composting process to be used at the facility, the daily operational methodology of the proposed process, the proposed processing and storage capacity of the facility and the expected life of the facility.
(2) A plan for an alternative waste handling or disposal system during periods when the proposed facility is not in operation, including procedures to be followed in case of equipment breakdown. Procedures may include the use of standby equipment, extension of operating hours or contractual agreements for diversion of residual waste to other facilities.
(3) A plan for sampling and analyzing the compost.
(4) A description of the anticipated quality of the compost.
(5) A plan for the anticipated recovery rate of compost from the process, and plans for the reuse, sale or marketing of the compost.
(6) A plan for managing compost if markets for the sale or reuse of compost become unavailable.
(7) A plan for the proposed location and method for disposal or processing of residue produced by operation of the facility.
(8) A plan for assuring that solid waste received at the facility is consistent with § 295.201 (relating to basic limitations).
(9) A plan for training equipment operators and other personnel concerning the operation and approved design of the facility.
(10) The proposed operating hours of the proposed facility.
(11) A narrative describing the procedures for inspection and monitoring of incoming waste.