Section 288.453 - Leachate transportation
Current through Register Vol. 55, No. 13, March 29, 2025
(a) For the first 3 years following initial discharge of leachate into the collection and handling system, leachate may be handled by vehicular transportation to, and leachate treatment at, an offsite treatment facility. Except as provided in § 288.414 (relating to modification of leachate treatment plan), the operator shall operate a leachate collection and treatment facility as provided in § 288.452 (relating to basic treatment methods) within 3 years following the detection of leachate in the collection or handling system.
(b) Vehicular transportation of leachate to an offsite treatment facility will not be allowed unless the following requirements are met:
(c) If the operator loses the ability to dispose at the facility and is unable to secure an alternate offsite treatment facility acceptable to the Department within 15 days from the loss of its approved treatment facility, implementation of the treatment plan required by § 288.452 shall begin immediately.
(d) If the operator cannot immediately implement a treatment plan under § 288.452 to comply with this article, The Clean Streams Law and regulations thereunder, and cannot locate an alternative offsite treatment facility with 15 days, the operator shall cease accepting waste at the facility for storage, processing or disposal. Cessation shall continue until the operator obtains an acceptable means of treating its leachate from the facility.
(e) Notwithstanding other provisions of this subchapter, the operator shall have in place at the site a permitted and fully operational system for fully treating leachate at least 3 full years before closure of the facility.
This section cited in 25 Pa. Code § 287.114 (relating to interim operational requirements for unpermitted processing or disposal facilities); 25 Pa. Code § 287.116 (relating to interim operational requirements); 25 Pa. Code § 288.413 (relating to leachate treatment plan); 25 Pa. Code § 288.414 (relating to modification of leachate treatment plan); 25 Pa. Code § 288.421 (relating to basic limitations); 25 Pa. Code § 288.451 (relating to scope); and 25 Pa. Code § 288.454 (relating to leachate recirculation).