Pennsylvania Code
Title 25 - ENVIRONMENTAL PROTECTION
Part I - Department of Environmental Protection
Subpart D - Environmental Health and Safety
Article IX - Residual Waste Management
Chapter 288 - RESIDUAL WASTE LANDFILLS
Subchapter C - OPERATING REQUIREMENTS
WATER QUALITY MONITORING
Section 288.257 - Abatement plan
Current through Register Vol. 54, No. 44, November 2, 2024
(a) The operator of a residual waste landfill shall prepare and submit to the Department an abatement plan whenever one of the following occurs:
(b) An abatement plan shall be prepared by an expert hydrogeologist and submitted to the Department. The plan shall contain the following information:
(c) If abatement is required in accordance with subsection (a), the operator shall demonstrate compliance with one or more of the following standards at the identified compliance points:
(d) For measuring compliance with secondary contaminants under subsection (c), paragraph (1) or (3), the Department may approve a compliance point beyond 150 meters on land owned by the owner of the disposal area.
(e) The abatement plan shall be completed and submitted to the Department for approval within 90 days of the time the obligation arises under this section unless the date is otherwise modified, in writing, by the Department.
(f) If the Department determines that the proposed plan is inadequate, the Department may modify the plan and approve the plan as modified or require the submission of an approvable modification.
(g) The abatement plan shall be implemented within 60 days of approval by the Department in accordance with the approved implementation schedule.
(h) If, after plan approval or implementation, the Department finds that the plan is incapable of achieving the groundwater protection contemplated in the approval, the Department may issue one or more of the following:
This section cited in 25 Pa. Code § 288.152 (relating to water quality monitoring plan); 25 Pa. Code § 288.251 (relating to general requirements); 25 Pa. Code § 288.256 (relating to groundwater assessment plan); 25 Pa. Code § 291.315 (relating to water quality monitoring); 25 Pa. Code § 291.416 (relating to water quality monitoring); 25 Pa. Code § 293.233 (relating to soil and groundwater monitoring); 25 Pa. Code § 295.254 (relating to soil and groundwater monitoring); and 25 Pa. Code § 297.233 (relating to soil and groundwater monitoring).