Pennsylvania Code
Title 25 - ENVIRONMENTAL PROTECTION
Part I - Department of Environmental Protection
Subpart C - Protection of Natural Resources
Article II - Water Resources
Chapter 109 - SAFE DRINKING WATER
Subchapter E - PERMIT REQUIREMENTS
Section 109.503 - Public water system construction permits
Current through Register Vol. 55, No. 13, March 29, 2025
(a) Permit application requirements. An application for a public water system construction permit shall be submitted in writing on forms provided by the Department and shall be accompanied by plans, specifications, engineer's report, water quality analyses and other data, information or documentation reasonably necessary to enable the Department to determine compliance with the act and this chapter. The Department will make available to the applicant the Public Water Supply Manual, available from the Bureau of Safe Drinking Water, Post Office Box 8467, Harrisburg, Pennsylvania 17105 which contains acceptable design standards and technical guidance. Water quality analyses shall be conducted by a laboratory accredited under this chapter.
(b) Amendments. A water supplier operating under a public water system permit shall obtain an amended construction permit before making a substantial modification to the public water system.
(c) Permit fees. An application for a permit from the Department under this subchapter must be accompanied by a fee in the amount specified in Subchapter N (relating to drinking water fees).
(d) Department's review.
(e) Issuance and conditions.
The provisions of this § 109.503 amended under section 4 of the Pennsylvania Safe Drinking Water Act (35 P.S. § 721.4); and section 1920-A of The Administrative Code of 1929 (71 P.S. § 510-20).
This section cited in 25 Pa. Code § 109.501 (relating to general permit requirements); 25 Pa. Code § 109.502 (relating to permitting of currently operating systems; compliance deadlines); 25 Pa. Code § 109.505 (relating to requirements for noncommunity water systems); 25 Pa. Code § 109.506 (relating to emergency permits); 25 Pa. Code § 109.507 (relating to permits for innovative technology); 25 Pa. Code § 109.609 (relating to reserved capacity and finished water storage); 25 Pa. Code § 109.703 (relating to facilities operation); 25 Pa. Code § 109.712 (relating to control of POE devices); 25 Pa. Code § 109.1005 (relating to permit requirements); 25 Pa. Code § 109.1105 (relating to permit requirements); 25 Pa. Code § 109.1404 (relating to community and noncommunity water system permitting fees); and 52 Pa. Code §3.501 (relating to certificate of public convenience as a water or wastewater collection, treatment and disposal supplier).