Section 102.22 - Site stabilization
Current through Register Vol. 55, No. 13, March 29, 2025
(a) Permanent stabilization. Upon final completion of an earth disturbance activity or any stage or phase of an activity, the site shall immediately have topsoil restored, replaced, or amended, seeded, mulched or otherwise permanently stabilized and protected from accelerated erosion and sedimentation.
(b) Temporary stabilization.
The provisions of this § 102.22 amended under sections 5 and 402 of The Clean Streams Law (35 P.S. §§ 691.5 and 691.402); sections 1917-A and 1920-A of The Administrative Code of 1929 (71 P.S. §§ 510-17 and 510-20); and section 11(2) of the Conservation District Law (3 P.S. § 859(2)).
This section cited in 25 Pa. Code § 78a.59a (relating to impoundment embankments); 25 Pa. Code § 78a.65 (relating to site restoration); and 25 Pa. Code § 102.7 (relating to permit termination).