Section 88.44 - Operation maps and operation plans
Current through Register Vol. 55, No. 13, March 29, 2025
(a) The application shall include maps and plans of the proposed permit and adjacent area, showing the following:
(b) Maps, plans and cross sections required by this section shall be on a scale satisfactory to the Department, but not less than 1:25,000 and in a manner satisfactory to the Department. The maps or plans and cross sections shall be prepared and certified by a qualified registered professional engineer, qualified registered professional land surveyor or qualified registered professional geologist with assistance from experts in related fields.
The provisions of this § 88.44 amended under the Surface Mining Conservation and Reclamation Act (52 P. S. §§ 1396.1-1396.19a); The Clean Streams Law (35 P. S. §§ 691.1-691.1001); and section 1920-A of The Administrative Code of 1929 (71 P. S. § 510-20).