Section 918-098-1015 - Scope of Work Allowed for Persons with an Oregon Inspector Certification and Oregon Code Certifications
Current through Register Vol. 63, No. 9, September 1, 2024
Persons who possess a valid Oregon Inspector Certification and a valid Oregon Code Certification may perform inspections and plan reviews based on the class designated on their certificate. The classes, other than electrical and plumbing inspector classifications found in OAR 918-281-0020 and 918-695-0400, are:
(1) Building Official. Persons certified as an Oregon Building Official may oversee jurisdictions' administration and enforcement of the state building code for those specialty codes assumed by the jurisdiction pursuant to ORS 455.148 or 455.150. Building officials may not perform plan reviews or inspections unless they possess the appropriate certification for the plan review or inspection being performed.
(2) Fire and Life Safety. Persons certified as fire and life safety plans examiners may review construction plans for compliance with the fire and life safety plan review provisions of the Oregon Structural Specialty Code and the Oregon Fire Code for any structure regulated by the Oregon Structural Specialty Code.
(3) A-Level.
(4) B-Level.
(5) One and two family dwelling or residential.
(6) Specialized Solar Photo-Voltaic. Persons certified as a Specialized Solar PV inspector may conduct inspections of the structural and electrical systems for solar PV installations up to 25 Kw that follow the "prescriptive installation" provisions in section 3111.5 of the Oregon Structural Specialty Code.
(7) Plumbing inspectors certified under OAR 918-695-0400 may, in addition to any other authority, inspect any portion of a solar water heating system installation up to 180 gallons of storage tank capacity. This rule does not apply to limited or special plumbing inspectors.
(8) Electrical inspectors certified under OAR 918-281-0020 may, in addition to any other authority, inspect any portion of a solar PV installation up to 25 Kw.
Publications: Publications referenced are available from the agency.
Stat. Auth.: ORS 455.720
Stats. Implemented: ORS 455.720