Current through Register Vol. 63, No. 12, December 1, 2024
(1)
Filing Fee: Registration as a prefabricated structure manufacturer:
(a) Each manufacturer or each plant
manufacturing three or more relocatable structures per year $100;
(b) Annual renewal of registration
$20;
(c) Administration fee for
change of name, ownership or location of manufacturing facility $20.
(2) Additional Fee for Travel to
Out-of-State Inspections:
(a) Commercial
travel shall be charged at the actual cost for bus, rail, air or ferry
fare;
(b) Cost of food, lodging,
car rental, parking and other reimbursable costs shall be charged at the rate
established for per diem allowance set by the State of Oregon for State
Employees;
(c) Out of state travel
fees begin at the Oregon border or at the point of departure by commercial
transportation.
(3) Plan
Review Fees:
(a) Plan review fees except for
plumbing and mechanical plan review, and the hourly design option plan review,
shall be based upon Table 1-PF or Table 2-PF; Table 1-PF shall be used for all
custom plan review fees and Table 2-PF for all design master plan review
fees;
(b) The Division structural
plan review fee shall not exceed the Table 1-PF (custom plans) or Table 2-PF
(design master plans) fees for 65 percent of the building valuation. The local
authority having jurisdiction's structural plan review fee for foundations and
all other site work shall be based on the valuation of the work performed on
site;
(c) The Division fire and
life safety plan review fee shall not exceed the Table 1 (custom plans) or
Table 2 (design master plans) fees for 40 percent of the building valuation.
The local authority having jurisdiction's fire and life safety plan review fee
shall be based on the valuation of the work performed on site;
(d) The plumbing plan review fee shall be 30
percent of the fee adopted in the Oregon Plumbing Specialty
Code;
(e) The mechanical
plan review fee shall be 25 percent of the fee adopted in the Oregon
Mechanical Specialty Code;
(f) The hourly fee for design option plan
review shall be $60 per hour;
(g)
The fee for renewal of design master plans and design options previously
reviewed and approved shall be 50 percent of the initial plan review
fees;
(h) The fee for additional
review of plans required by changes, addition or revisions shall be 50 percent
of the initial plan review fees;
(i) An administrative fee of $100 shall be
charged for transfer of approved plans to another manufacturer;
(j) The fee for resubmission of plans that
have expired or been revoked, shall be 100 percent of the appropriate plan
review fee;
(k) An administrative
fee of $60 shall be charged for filing a Notice to Local Enforcement
Agency;
(l) The valuation used to
calculate plan review fees for subsections (a), (b) and (c) of this section
shall be based on the Division's published valuation table or when approved by
the Division, the invoice price, FOB factory, of the prefabricated
structure;
(m) Design master plan
approval fees shall be 100 percent of the plan review fees in this section of
rule for one year, 150 percent of the fees in this section of rule for two
years and 200 percent of the fees in this section of rule for three years. The
annual renewal of design master plans shall be 50 percent of the fees in this
section of rule.
(4)
Manufacturer's Compliance Assurance Fees:
(a)
To review manufacturing facility compliance control manual = $400;
(b) For resubmission of a compliance control
manual that has been revoked or not approved = $200;
(c) To transfer a compliance control program
= $100;
(d) For inplant and field
evaluation or audit of a compliance control program = $60 per hour.
(5) Permit, Inspection and Service
Fees:
(a) The Division fee for a permit for
each prefabricated structure other than components, shall be computed at the
rate of $60 per hour, but shall not exceed the fees in Table 1-PF;
(b) The Division permit fee for component
buildings shall not exceed Table 1-PF for 35 percent of the building valuation.
The local authority having jurisdiction's permit fee for component building
installations and all site work shall be based on the valuation of the work
performed on site;
(c) The Division
permit fee for prefabricated sandwich panels shall be $.03 per square foot of
the total surface area for all panels erected. This fee shall be remitted to
the Division within one month of the time the structure is erected at the
building site. The local authority having jurisdiction's site inspection permit
fee shall be based on the valuation of the work performed on site;
(d) The Division permit fee for building
components not identified in subsections (b) and (c) of this section shall not
exceed the Table 1-PF fees for 35 percent of the building valuation. The local
authority having jurisdiction's permit fee for building component installations
and all site work shall be based on the valuation of the work performed on
site;
(e) Any required reinspection
shall be charged at the rate of $60 per hour not to exceed the fees in Table
1-PF for 50 percent of the building valuation;
(f) A fee of $19.50 per hour shall be charged
for technical consultation, with a minimum charge of one hour;
(g) For an occupancy not found in OAR
918-460-0030 Table 2-S, use
subsection (h) of this section to calculate permit fees;
(h) The valuation used to calculate permit
fees for subsections (a), (b), (c) and (d) of this section may be based on the
Division's published valuation table or when approved by the Division, the
invoice price, FOB factory, of the prefabricated structure.
(6) Insignia of Compliance Fees:
(a) For the first section or module
$50;
(b) For each additional
section or module $35;
(c) For
building components and service cores $50.
(7) Third-party agency fees:
(a) Certification application review fee:
$400;
(b) Certification renewal
fee: $200;
(c) Certification
amendment fee: $60;
(d) Application
for recertification fee: $400;
(e)
Monitoring fee: $60 per hour.
(8) Other Inspection Fees:
(a) A special inspection fee shall be paid
before a permit is issued for work started without a permit. The special
inspection fee shall be equal to and in addition to the amount of the permit
fee required by these rules;
(b) In
addition to the called for inspections, the authority having jurisdiction may
make or require additional inspections to insure compliance with the provisions
of Oregon law, Oregon Specialty Codes and administrative rule;
(c) A reinspection fee may be assessed for
each inspection or reinspection when the work for which an inspection is called
is not complete or when required corrections are not made;
(d) The Division's plan review or permit fees
collected for the initial construction and installation of each prefabricated
structure shall not exceed 100 percent of rates in Tables 1-PF or Table 2-PF
except for incomplete structures or rework requiring additional inspections or
plan reviews.
Publications: Publications referenced are available from the
agency.
NOTE: Tables referenced are not included in rule text. To
view tables referenced in rule text,
click here to view
rule.
Statutory/Other Authority: ORS
455.030,
455.100,
455.110,
455.210 &
455.685
Statutes/Other Implemented: ORS
455.210