Oregon Administrative Rules
Chapter 918 - DEPARTMENT OF CONSUMER AND BUSINESS SERVICES, BUILDING CODES DIVISION
Division 309 - ELECTRICAL PERMITS AND FEES
Section 918-309-0400 - Restricted Energy Electrical Permit Application
Current through Register Vol. 63, No. 9, September 1, 2024
(1) A separate Restricted Energy Electrical Permit Application Form and Restricted Energy Electrical Installer Log are created and adopted.
(2) The Restricted Energy Electrical Permit can be taken out by a general or subcontractor, limited energy installer or property owner for the fee set by the board in OAR 918-309-0030 for limited energy transactions provided the requirements of this rule are met. The person applying for the permit must:
(3) Options. The person obtaining the permit may:
(4) The restricted energy activities to be covered by the permit must be declared at the time of the purchase of the permit:
(5) Regardless of what was initially intended the permit only covers those installations that are in place at the time of the first call for limited energy electrical inspection. A separate permit must be purchased for all other limited energy installations whether the installations become ready for inspection at a later date or are done at a later date.
(6) This rule does not apply to an industrial plant when ORS 479.560 is applicable.
(7) The Restricted Energy Electrical Installer Log must be posted at the job site for signing by appropriate persons installing the separate electrical systems as shown on the form. A municipality may require more than one log to be completed and left at the job site if it chooses to.
Stat. Auth.: ORS 479.540
Stats. Implemented: ORS 479.540