Oregon Administrative Rules
Chapter 918 - DEPARTMENT OF CONSUMER AND BUSINESS SERVICES, BUILDING CODES DIVISION
Division 309 - ELECTRICAL PERMITS AND FEES
Section 918-309-0070 - Miscellaneous
Current through Register Vol. 63, No. 9, September 1, 2024
Special fees are established for the following items in lieu of fees set under OAR 918-309-0060.
(1) Permit for each domestic water or sewage pump, irrigation pump or circle and its associated controls, excluding service fee, $63;
(2) Permit for the installation of each electrical sign or outline lighting system supplied by a single branch circuit, $63.
(3) Each limited energy circuit panel, one or more air-conditioning or heater thermostats installed at a job site, multiple circuit terminal board or installation or extension of limited energy circuits, $63.
(4) The permit fees in this rule, except as noted in subsection (11), are for up to two inspections and are charged in addition to other fees for electrical service.
(5) Note the exception under OAR 918-309-0030(3)(a)(A) dealing with residential limited energy.
(6) Installation of signal circuits in buildings over three floors. Each floor in excess of three is considered a separate panel for the purpose of calculating fees.
(7) Fees for inspections in excess of those allowed under OAR 918-309-0030 through 918-309-0060, $55.
(8) Fees for other inspections not covered by this rule. All inspections not provided in this rule must be charged at $86 per hour including travel and office time with a minimum charge of one hour.
(9) Fees for Bulk Labels:
(10) The fee for swimming pools is permitted as provided in OAR 918-309-0040 and 918-309-0060. The inspection of the grounding of the pool is included in the permit for the pool and counted as one of the number of allowed inspections under the permit.
(11) Permit fees for renewable electrical energy systems. For renewable electrical energy permit applications, see OAR 918-309-0410. For repairs and maintenance of renewable electrical energy systems, see OAR 918-309-0220(5).
(12) Work Commencing before permit issuance. Any person who commences electrical work on a building or structure before obtaining the necessary permits will be subject to an investigative fee. The amount of the investigative fee is the average or actual additional cost of ensuring that a building or structure is in conformance with the Oregon Electrical Specialty Code and is in addition to the required permit fees.
Stat. Auth.: ORS 479.870
Stats. Implemented: ORS 455.083 & 479.870