Oregon Administrative Rules
Chapter 918 - DEPARTMENT OF CONSUMER AND BUSINESS SERVICES, BUILDING CODES DIVISION
Division 305 - ELECTRICAL CODES AND STANDARDS
Section 918-305-0510 - Standards for Electrified Fixed Guideway Railway Plan Review

Universal Citation: OR Admin Rules 918-305-0510

Current through Register Vol. 63, No. 9, September 1, 2024

A person performing electrical plan review shall be certified under OAR 918-311-0030 and do the following as a minimum when performing plan reviews:

(1) Load Calculations. Check load calculations for appropriateness, completeness and accuracy.

(2) Equipment. Check and determine if the equipment is:

(a) Suitable for the environment; and

(b) Properly sized and rated to meet the minimum code requirements.

(3) Service and Feeder. Check service and feeder installations for code compliance related to:

(a) Wiring method;

(b) Conduit and box fill;

(c) Conductor size and ampacity rating;

(d) Clearances;

(e) Locations;

(f) Accessibility; and

(g) Service grounding conductor size.

Stat. Auth.: ORS 479.950

Stats. Implemented: ORS 479.950

Disclaimer: These regulations may not be the most recent version. Oregon may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.