Oregon Administrative Rules
Chapter 918 - DEPARTMENT OF CONSUMER AND BUSINESS SERVICES, BUILDING CODES DIVISION
Division 305 - ELECTRICAL CODES AND STANDARDS
Section 918-305-0420 - Electrified Fixed Guideway Passenger Railway System Permits
Current through Register Vol. 63, No. 9, September 1, 2024
(1) The signature of a general supervising electrician or limited supervising electrician shall be required on each permit to aid inspections by the division and indicate responsibility under ORS 479.950.
(2) A permit is required prior to start of any electrical work. Expansion of work under a permit may be added to an existing permit prior to final inspection.
(3) A permit must be posted in a conspicuous place near the main electrical panel location. If there is no main panel installed, the permit shall be posted in a conspicuous place on the job site.
(4) An electrical permit issued to one person or firm is not transferable and shall not permit any other person or firm to perform any electrical work thereunder.
(5) Any permittee holding an unexpired permit may apply for an extension of the time within which work may be completed.
(6) Permit fees shall be charged at $69 per hour including travel and office time with a minimum charge of one hour for any and all inspections performed on that permit.
Stat. Auth.: ORS 479.950
Stats. Implemented: ORS 479.950