Oregon Administrative Rules
Chapter 918 - DEPARTMENT OF CONSUMER AND BUSINESS SERVICES, BUILDING CODES DIVISION
Division 225 - BOILERS AND PRESSURE VESSELS
Section 918-225-0620 - Bulk Rate Permits

Universal Citation: OR Admin Rules 918-225-0620

Current through Register Vol. 63, No. 3, March 1, 2024

(1) Bulk rate permits may be granted if there is a quantity of either six (6) or more boilers or six (6) or more pressure vessels at the same location.

(2) To obtain bulk rate permits, the owner or user must make a written request to the division at least 30 days before the expiration of existing operating permits.

(3) If a bulk rate site requires two or more inspections during an inspection cycle, the division may rescind bulk rate permits and charge the full operating permit fees, as provided in Table 3-B. Inspection cycles are listed in OAR 918-225-0570 Table 1-B.

[NOTE: Table referenced is not included in rule text.]

To view tables referenced in rule text, click here to view rule.

Statutory/Other Authority: ORS 480.600

Statutes/Other Implemented: ORS 480.600

Disclaimer: These regulations may not be the most recent version. Oregon may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.