Current through Register Vol. 63, No. 9, September 1, 2024
All applications for major Licenses or major Permits shall
include the information described in this rule. The applicant shall supply the
information in sufficient detail which also evaluates the potential for
cumulative impacts with other proposed, approved and existing projects in the
same river basin. An application shall be deemed incomplete and shall not be
accepted for filing if it lacks any of the following information as it may
apply to the project. Major projects which are of a size that an extraordinary
financial burden is imposed by providing specific information required in this
section may seek a waiver of the specific requirement from the Director by
describing the specific nature of the hardship. The request for waiver shall be
made at the time of application. The application shall contain:
(5) Proof that the applicant complies with
the statutory or regulatory requirements of the state with respect to the
applicants right to engage in the business of developing, transmitting, and
distributing power and in any other business necessary to accomplish the
purposes of the License (provide citation and brief identification of the
nature of each requirement; if the applicant is a municipality, the applicant
must submit copies of applicable state or local laws or municipal charter or,
if such laws or documents are not clear, any other appropriate legal authority,
evidencing that the municipality is competent under such laws to engage in the
business of developing, transmitting, utilizing, or distributing power, and,
the steps which the applicant has taken, or plans to take, to comply with each
of the laws cited above).
(6) An
Exhibit A which shall be a description of the project. If the project includes
more than one dam with associated facilities, each dam and the associated
component parts must be described together as a discrete development. The
description for each development must contain:
(a) The physical composition, dimensions, and
general configuration of any dams, spillways, penstocks, powerhouses, tailraces
or other structures proposed to be included as part of the project;
(b) The normal maximum water surface area and
normal maximum water surface elevation (mean sea level); gross storage capacity
of any impoundments to be included as part of the project;
(c) The number, type and rated capacity of
any proposed turbines or generators to be included as part of the
project;
(d) The number, length,
voltage and interconnections of any primary transmission lines proposed to be
included as part of the project;
(e) The description of any additional
mechanical, electrical, and transmission equipment appurtenant to the project;
and
(f) A list of property owners
within 300 feet of the project boundary if the project is within an urban
growth boundary or within 1,000 feet if the project is outside of an urban
growth boundary giving their name, address and the amount of land under their
ownership in acres or hectares.
(7) An Exhibit B which shall be a statement
of project operation and resource utilization. If the project includes more
than one dam with associated facilities, the information must be provided
separately for each discrete development. The exhibit must contain:
(a) A description of each alternative site
considered in selecting the proposed site;
(b) A description of any alternative facility
designs, processes, and operations that were considered;
(c) A statement as to whether operation of
the power plant will be manual or automatic, an estimate of the annual plant
factor, and a statement of how the project will be operated during adverse,
mean, and high water years; and
(d)
An estimate of the dependable and average annual energy production in
kilowatt-hours (or mechanical equivalent), supported by the following data:
(A) The minimum, mean, and maximum recorded
flows in cubic feet per second of the stream or other body of water at the
powerplant intake or point of diversion, with a specification of any adjustment
made for evaporation, leakage, minimum flow releases (including duration of
releases) or other reductions in available flow; a flow duration curve
indicating the period of record and the gauging stations used in deriving the
curve; and a specification of the critical streamflow used to determine the
dependable capacity;
(B) An
area-capacity curve showing the gross storage capacity and usable storage
capacity of the impoundment, with a rule curve showing the proposed operation
of the impoundment and how the usable storage capacity is to be
utilized;
(C) The estimated
hydraulic capacity of the powerplant in terms of flow and efficiency (cubic
feet per second and one-half, full and best gate), and the corresponding
generator output in kilowatts;
(D)
A tailwater rating curve; and
(E) A
curve showing powerplant capability versus head and specifying maximum, normal,
and minimum heads.
(10) An Exhibit C
which shall be a proposed construction schedule for the project. The
information required may be supplemented with a bar chart. The construction
schedule must contain:
(a) The proposed
commencement and completion dates of any new construction, modification, or
repair of major project works;
(b)
The proposed commencement date of first commercial operation of each new major
facility and generating unit; and
(c) If any portion of the proposed project
consists of previously constructed, Licensed or unlicensed water power
structures or facilities, a chronology of original completion dates of those
structures or facilities specifying dates (approximate dates must be identified
as such) of:
(A) Commencement and completion
of construction or installation;
(B) Commencement of first commercial
operation; and
(C) Any additions or
modifications other than routine maintenance.
(11) An Exhibit D which shall be a statement
of project costs and financing. The exhibit must contain:
(a) A statement of estimated costs of any new
construction, modification, or repair, including:
(A) The cost of any land or water rights
necessary to the development;
(B)
The total cost of all major project works;
(C) Indirect construction costs such as costs
of construction equipment, camps, and commissaries;
(D) Interest during construction;
and
(E) Overhead, construction,
legal expenses, and contingencies.
(b) If any portion of the proposed project
consists of previously constructed, Licensed or unlicensed water power
structures or facilities, a statement of the original cost of those structures
or facilities specifying for each, to the extent possible, the actual or
approximate total costs (approximate cost must be identified as such) of:
(A) Any land or water rights necessary to the
existing project works;
(B) All
major project works; and
(C) Any
additions or modifications other than routine maintenance.
(c) A statement of the estimated average
annual cost of the total project as proposed, specifying any projected changes
in the costs (life-cycle costs) over the estimated financing or licensing
period if the applicant takes such changes into account, including:
(A) Cost of capital (equity and
debt);
(B) Local, state, and
federal taxes;
(C) Depreciation or
amortization, a definitive amortization schedule; and
(D) Operation and maintenance expenses,
including interim replacements, insurance, administrative and general expenses,
and contingencies;
(d) A
statement of the estimated annual value of project power based on a showing of
the contract price for sale of power or the estimated average annual cost of
obtaining an equivalent amount of power (capacity and energy) from the lowest
cost alternative source of power, specifying any projected changes in the costs
(life-cycle costs) of power from that source over the estimated financing or
licensing period if the applicant takes such changes into
account.
(14) Exhibit E shall be an Environmental
Report. Information provided in the report must be organized and referenced
according to the itemized paragraphs below. See OAR 690-551-0060 for
consultation requirements. See OAR 690-051-0170 through 690-051-0280 for a
description of resource standards. Exhibit E must include a list of all
publication, reports, and other literature which were cited or otherwise
utilized in the preparation of any part of the environmental report. The
Environmental Report must contain the following information:
(a) A General description of the locale. The
applicant must provide a general description of the environment of the proposed
project and its immediate vicinity. The description must include location and
general information helpful to an understanding of the environmental setting.
(b) A report on water use and
quality. The report must discuss water quality and flows and contain baseline
data sufficient to determine the normal and seasonal variability, the impacts
expected during construction and operation, and any mitigative, enhancement,
and protective measures proposed by the applicant. The report must be prepared
in consultation with the state and federal agencies with responsibility for
management of water quality and quantity in the affected stream or other body
of water. The report must include:
(A) A
description of existing instream flow uses of streams in the project area that
would be affected by construction and operation; estimated quantities of water
discharged from the proposed project for power production; and any existing and
proposed uses of project waters for irrigation, domestic water supply,
industrial and other purposes;
(B)
A description of the seasonal variation of existing water quality for any
stream, lake, or reservoir that would be affected by the proposed project,
including (as appropriate) measurements of: Significant ions, chlorophyll a,
nutrients, specific conductance, pH, total dissolved solids, total alkalinity,
total hardness, dissolved oxygen, bacteria, temperature, suspended sediments,
turbidity and vertical illumination;
(C) A description of any existing lake or
reservoir and any of the propose project reservoirs including surface area,
volume, maximum depth, mean depth, flushing rate, shoreline length, substrate
classification, and gradient for streams directly affected by the proposed
project;
(D) A quantification of
the anticipated impacts of the proposed construction and operation of project
facilities on water quality and downstream flows, such as temperature,
turbidity and nutrients;
(E) A
description of measures recommended by local governments, federal and state
agencies and the applicant for the purpose of protecting or improving water
quality, stream flows, riparian areas, and wetlands during project construction
and operation; an explanation of why the applicant has rejected any measures
recommended by any agency; and a description of the applicant's alternative
measures to protect or improve water quality stream flow;
(F) A description of groundwater in the
vicinity of the proposed project, including water table and artesian
conditions, the hydraulic gradient, the degree to which groundwater and surface
water are hydraulically connected, aquifers and their use as water supply, and
the location of springs, wells, artesian flows and disappearing streams; a
description of anticipated impacts on groundwater and measures proposed by the
applicant and others for the mitigation of impacts on groundwater;
and
(c) A report on
fish, wildlife, and botanical resources. The applicant must provide a report
that describes the fish, wildlife, and botanical resources in the vicinity of
the proposed project; expected impacts of the project on these resources; and
mitigation, enhancement, or protection measures proposed by the applicant. The
report must be prepared in consultation with the state agency or agencies with
responsibility for these resources, including the Oregon Department of Fish and
Wildlife, the U.S. Fish and Wildlife Service, The National Marine Fisheries
Service (if proposed project may affect anadromous, estuarine, or marine fish
resources), and any local government, state or federal agency with managerial
authority over any part of the proposed project lands. The report must contain:
(A) A description of existing fish, wildlife,
and plant communities of the proposed project area and its vicinity, including
any downstream areas that may be affected by the proposed project and within
the transmission line corridor or right-of-way. A map of vegetation types shall
be included in the description. For species considered important because of
their commercial or recreational value, the information provided should include
temporal and spatial distributions and densities of such species. Any fish,
wildlife, or plant species proposed or listed as threatened or endangered by
the U.S. Fish and Wildlife Service, National Marine Fisheries Service, Oregon
Department of Fish and Wildlife or Department of Agriculture must be
identified;
(B) A description of
the anticipated impacts on fish and wildlife and botanical resources of the
proposed construction and operation of project facilities, including possible
changes in size, distribution, and reproduction of essential population of
these resources and any impacts on human utilization of these
resources;
(C) A description of any
measures or facilities recommended by state or federal agencies for the
mitigation of impacts on fish, wildlife, and botanical resources, or for the
protection or enhancement of these resources, the impact on threatened or
endangered species, and an explanation of why the applicant has determined any
measures or facilities recommended by an agency are inappropriate as well as a
description of alternative measures proposed by the applicant to protect fish
and wildlife and botanical resources; and
(D) The following materials and information
regarding any mitigation measures or facilities, identified under the clause in
paragraph (C) of this subsection, proposed for implementation or construction:
(i) Functional design drawings;
(ii) A description of proposed operation and
maintenance procedures for any proposed measures or facilities;
(iii) An implementation, construction and
operation schedule for any proposed measures or facilities;
(iv) An estimate of the costs of
construction, operation, and maintenance of any proposed facilities or
implementation of any measures;
(v)
A statement of the sources and amount of financing for mitigation measures or
facilities; and
(vi) A map or
drawing showing, by the use of shading, crosshatching or other symbols, the
identity and location of any proposed measures or
facilities.
(d)
A report on historical and archaeological resources. The application must
provide a report that discusses any historical and archaeological resources in
the proposed project area, the impact of the proposed project on those
resources and the avoidance, mitigation, and protection measures proposed by
the applicant. The report must be prepared in consultation with the State
Historical Preservation Office (SHPO)and National Park Service of the U.S.
Department of Interior. The report must contain:
(A) A description of any discovery measures,
such as surveys, inventories and limited subsurface testing work recommended by
the specified state and federal agencies for the purpose of locating,
identifying, and assessing the significance of historic and archaeological
resources that would be affected by construction and operation of the proposed
project, together with a statement of the applicant's position regarding the
acceptability of the recommendations;
(B) The results of surveys, inventories, and
subsurface testing work recommended by the state and federal agencies listed
above, together with an explanation by the applicant of any variations from the
survey, inventory, or testing procedures recommended;
(C) An identification (without providing
specific site or property locations) of any historic or archaeological site in
the proposed project area, with particular emphasis on sites or properties
either listed in the affected local government(s) comprehensive plan, or
recommended by the SHPO for inclusion in, the National Register of Historic
Places that would be affected by the construction of the proposed
project;
(D) A description of the
likely direct and indirect impacts of proposed project construction or
operation on sites or properties either listed in, or recommended as eligible
for, the National Register of Historic Places;
(E) A management plan for the avoidance of,
or mitigation of, impacts on historic or archaeological sites and resources
based upon the recommendations of the local government, state and federal
agencies listed above and containing the applicant's explanation of variations
from those recommendations; and
(F)
The following materials and information regarding the mitigation measures
described under paragraph (14)(d)(E) of this rule:
(i) A schedule for implementing the
mitigation proposals;
(ii) An
estimate of the cost of the measures; and
(iii) A statement of the sources and extent
of financing;
(iv) The applicant
must provide five copies of any survey, inventory, or subsurface testing
reports containing specific site and property information, and including maps
and photographs showing the location and any required alteration of historic
and archaeological resources in relation to proposed project
facilities.
(e)
A report on socio-economic impacts. The applicant must provide a report which
identifies and quantifies the impacts of constructing and operating the
proposed project on employment, population, housing, personal income, local
governmental services, local tax revenues and other factors within the cities
and counties in the vicinity of the proposed project. The report must include:
(A) A description of the socio-economic
impact area;
(B) A description of
employment, population and personal income trends in the impact area;
(C) An evaluation of the impact of any
substantial immigration of people on the impact area's governmental facilities
and services, such as police, fire, health and educational facilities and
programs;
(D) The onsite personnel
requirements and payroll during and after project construction, including a
projection of total onsite employment and construction payroll provided by
month;
(E) The numbers of project
construction personnel who:
(i) Currently
reside within the impact area;
(ii)
Would commute daily to the construction site from places situated outside the
impact area; and
(iii) Would
relocate on a temporary basis within the impact area.
(F) A determination of whether the existing
supply of available housing within the impact area is sufficient to meet the
needs of the additional population;
(G) Numbers and types of residences and
business establishments that would be displayed by the proposed project,
procedures to be utilized to acquire these properties, and types and amounts of
relocation assistance payments that would be paid to the affected property
owners and businesses; and
(H) A
fiscal impact analysis evaluating the incremental local government expenditures
in relation to the incremental local government revenues that would result from
the construction of the proposed project. Incremental expenditures may include,
but are not limited to, school operating costs, road maintenance and repair,
public safety, and public utility costs.
(f) A report on geological and soil
resources. The applicant must provide a report on the geological and soil
resources in the proposed project area and other lands that would be directly
or indirectly affected by the proposed action and the impacts of the proposed
project on those resources. The information required may be supplemented with
maps showing the location and description of conditions. The report must be
prepared in consultation with the Oregon Department of Geology and Mineral
Industries. The report must contain:
(A) A
detailed description of geological features, including bedrock lithology,
stratigraphy, structural features, glacial features, unconsolidated deposits,
and mineral resources;
(B) A
detailed description of the soils, including the types, occurrences, physical
and chemical characteristics, erodability and potential for mass soil
movement;
(C) A description showing
the location of existing and potential geological and soil hazards and
problems, including earthquake faults, seepage, subsidence solution cavities,
active and abandoned mines, erosion, and mass soil movement and an
identification of any large landslides or potentially unstable soil masses
which could be aggravated by reservoir fluctuation;
(D) A description of the anticipated erosion,
mass soil movement and other impacts on the geological and soil resources due
to construction and operation of the proposed project; and
(E) A description of any proposed measures or
facilities for the mitigation of impacts on soils.
(g) A report on recreational resources. The
applicant must prepare a report containing a proposed recreation plan
describing utilization, design and development of project recreational
facilities, and public access to the project area. Development of the plan
should include consideration of the needs of the physically handicapped. Public
and private recreational facilities provided by others that would abut the
project should be noted in the report. The report must be prepared in
consultation with appropriate local, regional state and federal recreation
agencies and planning commissions, and any other agency with managerial
responsibility for any part of the project lands. The report must contain:
(A) A description of any areas within or in
the vicinity of the proposed boundary that are included in, or have been
designated for study for inclusion in:
(i) The
National Wild and Scenic Rivers Systems;
(ii) The Oregon Scenic Waterway
Program;
(iii)The National Trails
System; or
(iv) The Oregon
Recreation Trails System Act of 1971;
(v) Oregon Natural Heritage Conservation
Areas;
(vi) A wilderness area
designated under the Wilderness Act;
(B) A detailed description of existing
recreational facilities within the project vicinity, and the public
recreational facilities which are to be provided by the applicant at its sole
cost or in cooperation with others no later than three years from the date of
the first commercial operation of the proposed project and those recreation
facilities planned for future development based on anticipated demand. When
public recreation facilities are to be provided by other entities, the
applicant and those entities shall enter into an agreement on the type of
facilities to be provided and the method of operation. Copies of agreements
with cooperating entities are to be appended to the plan;
(C) A provision for a shoreline buffer zone
that must be within the project boundary, above the normal maximum surface
elevation of the project reservoir, and of sufficient width to allow public
access to project lands and waters and to protect the scenic, public
recreational, cultural and other environmental values of the reservoir
shoreline;
(D) Estimates of
existing and future recreational use at the project, in daytime and overnight
visitation (recreation days), with a description of the methodology used in
developing these data;
(E) A
development schedule and cost estimates of the construction, operation, and
maintenance of existing initial and future public recreational facilities,
including a statement of the source and extend of financing for such
facilities;
(F) Adescription of any
measures or facilities recommended by the agencies consulted for the purpose of
creating, preserving, or enhancing recreational opportunities at the proposed
project, and for the purpose of ensuring the safety of the public in its use of
project lands and waters, including an explanation of why the applicant has
rejected any measures or facilities recommended by an agency; and
(G) A drawing or drawings, one of which
describes the entire project area clearly showing:
(i) The location of project lands and the
types and number of existing recreational facilities and those proposed for
initial development, including access roads and trails, and facilities for
camping, picnicking, swimming, boat docking and launching, fishing and hunting,
as well as provisions for sanitation and waste disposal;
(ii) The location of project lands and the
type and number of recreational facilities planned for future
development;
(iii) The location of
all project lands reserved for recreational uses other than those included in
subparagraphs (g)(G)(i) and (ii) of this section; and
(iv) The project boundary (excluding
surveying details) of all areas designated for recreational development,
sufficiently referenced to the appropriate Exhibit G drawings to show that all
lands reserved for existing and future public recreational development and the
shoreline buffer zone are included within the project
boundary.
(h) A
report on aesthetic resources. The applicant must provide a report that
describes the aesthetic resources of the proposed project area, the expected
impacts of the project on these resources, and the mitigation enhancement or
protection measures proposed. The report must be prepared following
consultation with federal, state, and local agencies having managerial
responsibility for any part of the proposed project lands or lands abutting
those lands. The report must contain:
(A) A
description of the aesthetic character of lands and waters directly and
indirectly affected by the proposed project facilities;
(B) A description of the anticipated impacts
on aesthetic resources from construction activity and related equipment and
material, and the subsequent presence of proposed project facilities in the
landscape;
(C) A description of
mitigative measures proposed by the applicant, including architectural design,
landscaping, and other reasonable treatment to be given project works to
preserve and enhance aesthetic and related resources during construction and
operation of proposed project facilities; and
(D) Maps, drawings and photographs sufficient
to provide an understanding of the information required under this paragraph.
Maps or drawings may be consolidated with other maps or drawings required in
this exhibit.
(i) A
report on land use. The applicant must provide a report that describes the
existing uses of the proposed project lands and adjacent property, and those
land uses which would occur if the project is constructed. The report may
reference the discussions of land uses in other sections of this exhibit. The
report must be prepared following consultation with local planning and land
management authorities, and any federal or state agency with managerial
responsibility for the proposed project or abutting lands. The report must
include:
(A) A description of existing land
use in the proposed project area, including identification of wetlands,
floodlands, and high value or important farm land identified pursuant to
OARChapter 660, Division 33 and the coastal zone described in the Oregon
Coastal Zone Management Program, and, land owned or subject to control by
government agencies;
(B) A
description of the proposed land uses within and abutting the project boundary
that would occur as a result of development and operation of the project;
and
(C) Aerial photographs, maps,
drawings or other graphics sufficient to show location, extent and nature of
the land uses referred to in this section.
(j) Alternative locations, designs, and
energy sources. The applicant must provide an environmental assessment of the
following:
(A) Alternative sites considered in
arriving at the selection of the proposed project site;
(B) Alternative facility designs, processes,
and operations that were considered and the reasons for their
rejection;
(C) Alternative
electrical energy sources, such as gas, oil, coal, and nuclear-fueled power
plants, purchased power or diversity exchange, and other conventional and
pumped-storage hydroelectric plants; and
(D) The overall consequences if the License
application is denied.
(15) Exhibit F consists of general design
drawings of the principal project works described under Exhibit A and
supporting information used as the basis of design. If the Exhibit F submitted
with the application is preliminary in nature, applicant must so state in the
application. The exhibit must consist of ink drawings, or drawings of similar
quality, on sheets no smaller than 8-1/2 inches by 11 inches, drawn to a scale
no smaller than 1 inch equals 50 feet for plans, elevations, and profiles, and
1 inch equals 10 feet for sections.
(a) The
drawings must show all major project structures in sufficient detail to provide
a full understanding of the project, including:
(A) Plans (overhead view);
(B) Elevations (front view);
(C) Profiles (side view); and
(D) Sections.
(b) The applicant may submit preliminary
design drawings with the application. The final Exhibit F may be submitted
during or after the licensing process and must show the precise plans and
specifications for proposed structures. If the project is Licensed on the basis
of preliminary designs, the applicant must submit a final Exhibit F for
Department approval prior to commencement of any construction of the
project;
(c) Supporting design
report. The applicant must furnish, at a minimum, the following supporting
information to demonstrate that existing and proposed structures are safe and
adequate to fulfill their stated functions and must submit such information in
a separate report at the time the application is filed. The report must
include:
(A) An assessment of the suitability
of the site and the reservoir rim stability based on geological and subsurface
investigations, including investigations of soils and rock borings and tests
for the evaluation of all foundations and construction materials sufficient to
determine the location and type of dam structure suitable for the
site;
(B) Copies of boring logs,
geology reports and laboratory test reports;
(C) An identification of all borrow areas and
quarry sites and an estimate of required quantities of suitable construction
material;
(D) Stability and stress
analyses for all major structures and critical abutment slopes under all
probable loading conditions, including seismic and hydrostatic forces induced
by water loads up to the Probable Maximum Flood as appropriate; and
(E) The base for determination of seismic
loading and the Spillway Design Flood in sufficient detail to permit
independent staff evaluation.
(d) The applicant must submit five copies of
this part of the supporting design report described in subsection (15)(c) of
this rule at the time preliminary and final design drawings are sub-mitted to
the Director for review. If the report contains preliminary drawings, it must
be designated a "Preliminary Supporting Design Report".
(16) Exhibit G shall be a map of the project.
All maps, plans, and drawings are required to be certified by a professional
engineer registered by the Board of Engineering Examiners of Oregon as required
by ORS 672.010 to
672.340 and shall bear the date
and number of the certificate of registra-tion of the professional engineer.
The map must consist of ink drawings or drawings of similar quality on sheets
no smaller than 8-1/2 inches by 11 inches and no larger than 24 inches by 36
inches, drawn to a scale no smaller than one inch equals 1,000 feet. If more
than one sheet is used, the sheets must be numbered consecutively, and each
sheet must bear a small insert sketch showing the entire project and indicating
that portion of the project depicted on that sheet. If at any time after the
application is filed there is any change in the project boundary, the applicant
must submit, within a reasonable period following the completion of project
construction, a final Exhibit G showing the extent of such changes. The map
must show:
(a) Location of the project and
principal features. The map must show the location of the project as a whole
with reference to the affected stream or other body of water and, if possible,
to a nearby town or any other permanent monuments or objects, such as roads,
transmission lines or other structures, that can be noted on the map and
recognized in the field. The map must also show the relative locations and
physical interrelationships of the principal project works and other features
described under Exhibit A;
(b)
Project boundary. The map must show a project boundary enclosing all project
works and other features described under Exhibit A that are to be Licensed. If
accurate survey information is not available at the time the License
application is filed, the applicant must so state, and a tentative boundary may
be submitted. The boundary must enclose only those lands necessary for
operation and maintenance of the project and for other project purposes, such
as recreation, shoreline control or protection of environmental resources
(Exhibit (E)). Existing residential, commercial, or other structures may be
inclined within the boundary only to the extent that underlying lands are
needed for project purposes (e.g., for flowage, public recreation, shoreline
control, or protection of environmental resources). If the boundary is on land
covered by a public survey, ties must be shown on the map at sufficient points
to permit accurate platting of the position of the boundary relative to the
lines of the public land survey. If the lands are not covered by a public land
survey, the best available legal description of the position of the boundary
must be provided, including distances and directions from fixed monuments or
physical features. The boundary must be described as follows:
(c) Impoundments. The boundary around a
project impoundment must be described by one of the following:
(A) Contour lines, including the contour
elevation (preferred method);
(B)
Specified courses and distances (metes and bounds);
(C) If the project lands are covered by a
public land survey, lines upon or parallel to the lines of the survey;
or
(D) Any combination of the above
methods.
(d) Continuous
features. The boundary around linear ("continuous") project features such as
access roads, transmission lines, and conduits may be described by specified
distances from center lines or offset lines of survey. The width of such
corridors must not exceed 200 feet unless good cause is shown for a greater
width. Several sections of a continuous feature may be shown on a single sheet
with information showing the sequence of contiguous sections;
(e) Noncontinuous features:
(A) The boundary around noncontinuous project
works such as dams, spillways, and powerhouses must be described by one of the
following:
(i) Contour lines;
(ii) Specified courses and
distances;
(iii) If the project
lands are covered by a public land survey, lines upon or parallel to the lines
of the survey; or
(iv) Any
combination of the above methods.
(B) The boundary must enclose only those
lands that are necessary for safe and efficient operation and maintenance of
the project or for other specified project purposes, such as public recreation
or protection of environmental resources.
(f) Ownership of property (keyed to the
ownership information in Exhibit A), including all federal, state and private
ownership, must be identified as such on the map by:
(A) Legal subdivisions of a public land
survey of the affected area (a protraction of identified township and section
lines is sufficient for this purpose); and
(B) In the absence of a public land survey,
the location of the ownerships according to the distances and directions from
fixed monuments or physical features. When a federal survey monu-ment or
federal bench mark will be destroyed or rendered unusable by the construction
of project works, at least two permanent, marked witness monuments or bench
marks must be established at accessible points. The maps show the location (and
elevation, for bench marks) of the survey monument or bench mark which will be
destroyed or rendered unusable, as well as of the witness monuments or bench
marks. Connecting courses and distances from the witness monuments or bench
marks to the original must also be shown.
(g) Lands over which the applicant has
acquired or plans to acquire rights to occupancy and use other than fee title,
including rights acquired for easement or lease;
(h) Provisions for protection of special
management areas as defined in OAR690-051-0170(2) or areas otherwise restricted
from development within the project vicinity.
Exhibits referenced in this rule are available from the
agency.
Stat. Auth.: ORS 197, ORS
536.025, ORS
536.027, ORS 537 & ORS
543