Section 690-230-0085 - Pump Testing of Low-Temperature Geothermal Injection Wells With an Anticipated Injection Rate Exceeding 15,000 Gallons Per Day
Current through Register Vol. 63, No. 9, September 1, 2024
(1) Low-temperature geothermal injection wells (other than flowing artesian wells) with an anticipated injection rate of greater than 15,000 gallons per day, shall be pump tested for a period for at least four hours. The pump test shall occur after the owner's pump test plan is approved by the Director, and prior to injecting into the well. The results of this test do not need to appear on the water well report. This test shall be in addition to the minimum one-hour test requirement under OAR 690-210-0370. Requirements for conducting the minimum four-hour pump test as discussed in this section (this type of test) are as follows:
(2) The owner may consult with the Department before selecting representative nearby wells for monitoring during the pump test. If monitoring wells are selected in absence of specific instructions from the Department, the measurement of water levels in each well shall adhere to the schedule established in subsection (1)(f) of this rule.
(3) The Director may require the owner of the well to have a pump test performed that is more detailed than the test requirements described in sections (1) and (2) of this rule. This more detailed test could include, but is not limited to, increased frequency of water level measurements, increased test duration and increased monitoring of observation wells. Such modifications will be required when possible impacts resulting from the proposed injection include, but are not limited to, thermal or hydrologic interference with existing water rights, water quality degradation or physical or mechanical failure of the well structure.
(4) For flowing artesian wells, pump test specifications shall be prescribed by the Department on a case-by-case basis.
Stat. Auth.: ORS 537
Stats. Implemented: ORS 537