Oregon Administrative Rules
Chapter 690 - WATER RESOURCES DEPARTMENT
Division 210 - WELL CONSTRUCTION STANDARDS
Section 690-210-0065 - Hydrofracturing

Universal Citation: OR Admin Rules 690-210-0065

Current through Register Vol. 63, No. 12, December 1, 2024

(1) If the water supply well is hydrofractured, the constructor shall so note on the well report. Information reported shall include methods and materials used, maximum pressure exerted on the formation, location of packers, initial and final static water level figures, as well as initial and final yield figures.

(2) In no case shall hydrofracturing allow commingling of waters within the well bore.

(3) The well shall not be hydrofractured within 20 feet of the bottom of the existing well casing.

(4) Clean sand or other materials (propping agents) approved by the Department may be injected into the well to hold the fractures open when the pressure is removed.

(5) All tools and propping agents shall be disinfected prior to placement into the well.

Stat. Auth.: ORS 536.090 & ORS 537.505 - ORS 537.795

Stats. Implemented:

Disclaimer: These regulations may not be the most recent version. Oregon may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.