Oregon Administrative Rules
Chapter 632 - DEPARTMENT OF GEOLOGY AND MINERAL INDUSTRIES
Division 15 - INFORMATION AND SEISMIC TEST HOLES
Section 632-015-0050 - Filing of Reports
Current through Register Vol. 63, No. 12, December 1, 2024
(1) Report on Completion. Within 45 days after the completion of the plugging of an information hole or seismic shot hole, the owner or operator must file a report with the department setting forth in detail the method used in plugging the well or wells. The report must be in a form acceptable to the department.
(2) The drilling records:
(3) Within 60 days after plugging, the permittee must file an affidavit with the department, setting forth the location of the information hole or seismic program and the method used to protect such water-bearing formation, if any, that was penetrated during the program or operation.
Stat. Auth.: ORS 516.090 & 520.095
Stats. Implemented: 520.027, 520.095 & 520.097