Oregon Administrative Rules
Chapter 330 - DEPARTMENT OF ENERGY
Division 92 - MINIMUM ENERGY EFFICIENCY STANDARDS FOR STATE-REGULATED APPLIANCES AND EQUIPMENT
Section 330-092-0015 - Effective Dates for Regulated Equipment

Universal Citation: OR Admin Rules 330-092-0015

Current through Register Vol. 63, No. 9, September 1, 2024

The following list specifies the effective dates for equipment standards, test procedures, listing, and labeling requirements which have been adopted in these rules.

(1) Bottle-type water dispensers, as defined in OAR 330-092-0010(1): The standards in OAR 330-092-0020(1) are effective for bottle-type water dispensers that are manufactured on or after January 1, 2022.

(2) Commercial hot food holding cabinets, as defined in ORS 469.229(13): The standards in ORS 469.233(2) are effective September 1, 2009 for sale of equipment in Oregon and September 1, 2010 for installation.

(3) Compact audio products, as defined in ORS 469.229(15): The standards in ORS 469.233(3) are effective September 1, 2009 for sale of equipment in Oregon and September 1, 2010 for installation.

(4) Digital versatile disc players and digital versatile disc recorders, as defined in ORS 469.229(21): The standards in ORS 469.233(4) are effective September 1, 2009 for sale of equipment in Oregon and September 1, 2010 for installation.

(5) Portable electric spas, as defined in OAR 330-092-0010(14): The standards in OAR 330-092-0020(5) are effective for portable electric spas that are manufactured on or after January 1, 2022.

(6) Televisions, as defined in ORS 469.229(46): The standards in ORS 469.233(6) are effective for televisions that are manufactured on or after January 1, 2014.

(7) Battery charger systems, as defined in ORS 469.229(6): The standards in ORS 469.233(7) are effective for:

(a) Large battery charger systems manufactured on or after January 1, 2014. Federally regulated large battery charger systems that are manufactured on or after June 13, 2018 are pre-empted from further state regulation.

(b) Small battery charger systems for sale at retail that are not USB charger systems with a battery capacity of 20 watt- hours or more and that are manufactured on or after January 1, 2014. Federally regulated small battery charger systems that are manufactured on or after June 13, 2018 are pre-empted from further state regulation.

(c) Small battery charger systems for sale at retail that are USB charger systems with a battery capacity of 20 watt- hours or more and that are manufactured on or after January 1, 2014. Federally regulated small battery charger systems that are manufactured on or after June 13, 2018 are pre-empted from further state regulation.

(d) Small battery charger systems that are not sold at retail that are manufactured on or after January 1, 2017. Federally regulated small battery charger systems that are manufactured on or after June 13, 2018 are pre-empted from further state regulation.

(e) Inductive charger systems manufactured on or after January 1, 2014, unless the inductive charger system uses less than one watt in battery maintenance mode, less than one watt in no battery mode and an average of one watt or less over the duration of the charge and battery maintenance mode test. Federally regulated inductive charger systems that are manufactured on or after June 13, 2018 are pre-empted from further state regulation.

(f) Battery backups and uninterruptible power supplies, manufactured on or after January 1, 2014, for small battery charger systems for sale at retail, which may not consume more than 0.8+ (0.0021xEb) watts in battery maintenance mode, where (Eb) is the battery capacity in watt-hours. Federally regulated uninterruptible power supplies that are manufactured on or after June 13, 2018 are pre-empted from further state regulation.

(g) Battery backups and uninterruptible power supplies, manufactured on or after January 1, 2017, for small battery charger systems not sold at retail, which may not consume more than 0.8+ (0.0021xEb) watts in battery maintenance mode, where (Eb) is the battery capacity in watt-hours. Federally regulated uninterruptible power supplies that are manufactured on or after June 13, 2018 are pre-empted from further state regulation.

(8) High light output double-ended quartz halogen lamps, as defined in ORS 469.229(27): The standards in ORS 469.233(8), are effective January 1, 2016, for sale of equipment and installation.

(9) High CRI fluorescent lamps: The standards in OAR 330-092-0020(9) are effective for high CRI fluorescent lamps that are manufactured on or after January 1, 2023.

(10) Computers and computer monitors: The standards in OAR 330-092-0020(10) are effective for computers and computer monitors that are manufactured on or after January 1, 2022.

(11) Plumbing fittings:

(a) Lavatory faucets and lavatory replacement aerators: The standards in OAR 330-092-0020(11) are effective for lavatory faucets and lavatory replacement aerators that are manufactured on or after January 1, 2022; and

(b) Kitchen faucets and kitchen replacement aerators: The standards in OAR 330-092-0020(11) are effective for kitchen faucets and kitchen replacement aerators that are manufactured on or after January 1, 2022; and

(c) Public lavatory faucets: The standards in OAR 330-092-0020(11) are effective for public lavatory faucets that are manufactured on or after January 1, 2022; and

(d) Showerheads: The standards in OAR 330-092-0020(11) are effective for showerheads that are manufactured on or after January 1, 2022.

(12) Commercial fryers: The standards in OAR 330-092-0020(12) are effective for commercial fryers that are manufactured on or after January 1, 2022.

(13) Commercial dishwashers: The standards in OAR 330-092-0020(13) are effective for commercial dishwashers that are manufactured on or after January 1, 2022.

(14) Commercial steam cookers: The standards in OAR 330-092-0020(14) rules are effective for commercial steam cookers that are manufactured on or after January 1, 2022.

(15) Residential ventilating fans: The standards in OAR 330-092-0020(15) are effective for residential ventilating fans that are manufactured on or after January 1, 2022.

(16) Electric storage water heaters: The standards in OAR 330-092-0020(16) are effective for electric storage water heaters that are manufactured on or after July 1, 2023.

(17) Spray Sprinkler Bodies: The standards in OAR 330-092-0020(17) are effective for spray sprinkler bodies that are manufactured on or after January 1, 2023.

Statutory/Other Authority: ORS 469.040, ORS 469.255 & ORS 469.261

Statutes/Other Implemented: ORS 469.229-469.261 & OL 2022, chapter 4 (House Bill 4057)

Disclaimer: These regulations may not be the most recent version. Oregon may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.