Oregon Administrative Rules
Chapter 330 - DEPARTMENT OF ENERGY
Division 160 - ESTABLISH A RENEWABLE ENERGY CERTIFICATE SYSTEM FOR THE OREGON RENEWABLE PORTFOLIO STANDARD (RPS)
Section 330-160-0050 - Hydroelectric Facility Upgrades
Current through Register Vol. 63, No. 9, September 1, 2024
(1) Efficiency upgrades from an Oregon RPS qualifying hydroelectric facility refers to additional incremental qualifying electricity production at an existing hydroelectric facility due to upgrades to existing generators, turbines and other Department-approved equipment changes. Efficiency upgrades do not include increased generation achieved through increased impoundments or increased appropriation or diversions of water.
(2) The generator representative must estimate the percentage increase in efficiency of the facility's hydroelectric power production due to an efficiency upgrade and provide that estimate to the Department via the supplemental application form provided by the Department for hydroelectric efficiency upgrades, with supporting documentation substantiating the estimate.
(3) The Department will determine the eligibility of incremental hydroelectric power production at an existing hydroelectric facility for purposes of Oregon RPS compliance.
(4) Capacity upgrades to a hydroelectric project are not eligible under ORS 469A.025(4)(b) for the Oregon RPS. Capacity upgrades to a hydroelectric project include any increase in generating capacity other than an increase from an efficiency upgrade.
(5) For hydroelectric efficiency upgrades made to a Federal Columbia River Power System facility consistent with this section, only the incremental generation attributable to Oregon's share, per ORS 469A.020(3), is eligible for the Oregon RPS.
(6) Effective January 1, 2013, annually and no later than December 31, the Department will publish a list of electric utilities that make sales of electricity to retail customers in more than one state. The list will indicate the most recent proportion of retail load that is located in Oregon, or, for investor-owned utilities, the most recent proportion of eligible Residential Exchange Load located in Oregon.
(7) Annually, on or around April 1, the Department may request that BPA provide the Department with a copy of the certificate transfer directions that BPA provides to WREGIS.
(8) After the fifth anniversary of the date the Department determines that a hydroelectric efficiency upgrade is eligible for the Oregon RPS, the Department will request from the generator representative a review of the performance of the efficiency upgrade. Except as provided in subsection (9) of this section, within six months of the Department's request, the generator representative must provide to the Department a new estimate of the facility's percentage increase in efficiency attributable to the efficiency upgrade with supporting documentation.
(9) The Department may grant an exemption from the review described in subsection (8) of this section to any facility for which the generator representative, within six months of the Department's request:
(10) If the Department determines that the percentage increase in efficiency attributable to the efficiency upgrade has changed from the facility's current RPS certification, it will revise the increment in WREGIS accordingly and notify the generator representative of the revised increment in writing. The revised increment in WREGIS will apply to all electricity generated on or after the date WREGIS is updated with the revised increment.
Stat. Auth.: ORS 469A.005 - 469A.210 & 469.040
Stats. Implemented: ORS 469A.005 - 469A.210