Section 141-089-0735 - Waterway Bank Stabilization - Activity-Specific Conditions
Universal Citation: OR Admin Rules 141-089-0735
Current through Register Vol. 63, No. 9, September 1, 2024
Proposed projects eligible for this General Authorization must adhere to the general conditions in OAR 141-089-0650 and the following activity-specific conditions:
(1) Anchoring. Anchoring materials must:
(a) Not
restrict or redirect flows; and
(b)
Be set below grade to minimize the appearance.
(2) Ballast. Use of rock and gravel for ballast and porous weirs is limited as follows:
(a) Only the minimal amount necessary may be
used to achieve project objectives;
(b) Rock must be placed in a manner that does
not increase the upland surface area;
(c) Rock must be placed in a way as to
minimize adverse impacts to the active channel;
(d) All rock must be placed, not dumped, from
above the bank line; and
(e) Only
erosion resistant rock from an upland source may be used. No broken concrete or
asphalt is allowed.
(3) Natural Materials. Material used must be similar to materials currently or historically found naturally in the stream reach.
Statutory/Other Authority: ORS 196.600 - 196.692 & 196.795 - 196.990
Statutes/Other Implemented: ORS 196.600 - 196.692 & 196.795 - 196.990
Disclaimer: These regulations may not be the most recent version. Oregon may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.