(1) Bio-Engineering. This activity includes placement of woody vegetation, vegetated geogrids, biodegradable logs, straw bales or straw logs used for bank protection, bank reshaping, terracing and erosion control.
(2) Bank Terracing. This activity includes bank terracing and sloping to facilitate establishment of woody vegetation. The project must meet the following criteria:
(3) Placement of Large Wood. Trees or root wads may be used. The project must meet the following criteria:
(4) Engineered Log Jams. Log jams may be placed in order to stabilize the bank for woody vegetation establishment. The project must meet the following criteria:
(5) Log Toe Placement. The project must meet the following criteria:
(6) Porous Weir. This activity includes the construction of a self-sustaining, low profile, structure including but not limited to cross vanes and artificial riffles. A porous weir delays but does not store water. It is used to redirect flow toward the center of the channel, provide energy dissipation and promote increased sedimentation along banks while allowing fish passage through a porous design. The project must meet the following criteria:
Statutory/Other Authority: ORS 196.600 - 196.692 & 196.795 - 196.990