Oregon Administrative Rules
Chapter 123 - OREGON BUSINESS DEVELOPMENT DEPARTMENT
Division 93 - SOLAR DEVELOPMENT INCENTIVE PROGRAM
Section 123-093-0400 - Qualification
Universal Citation: OR Admin Rules 123-093-0400
Current through Register Vol. 63, No. 9, September 1, 2024
The Department, in consultation with external organizations including, but not limited to, the Oregon Department of Energy (ODOE) will determine if a proposed project is qualified.
(1) A solar PV system is qualified if it:
(a) Has applied by January 2, 2017
(b) Is located in Oregon
(c) Has a Nameplate Capacity between 2 and 10
megawatts as measured in alternating current (MWac)
(d) Can be demonstrated, in a power purchase
agreement (PPA), that it has an agreed upon commercial operation date (COD) of
January 1, 2016 or later
(e) Is or
will be either directly connected to the electrical system of an Oregon
Investor-Owned Utility or Publicly Owned Utility, or is indirectly connected to
the electrical system of an Investor-Owned Utility or Publicly Owned Utility in
a manner that the Selection Committee determines is acceptable for Program
Enrollees
(f) Has or will have a
revenue grade meter or other device that monitors and measures the quantity of
energy generated by the Solar PV Energy System
(g) Meets any other siting, design,
interconnection, installation and electric output standards required by the
laws of Oregon
Stat. Auth.: Ch. 63, OL 2016 (HB 4037)
Stats. Implemented: Ch. 63, OL 2016 (HB 4037)
Disclaimer: These regulations may not be the most recent version. Oregon may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.