Section 123-043-0095 - Recipient Responsibilities
Current through Register Vol. 63, No. 9, September 1, 2024
(1) The municipality must comply with all applicable state laws, regulations and requirements, such as Oregon prevailing wage rates, municipal audit law, and procurement regulations.
(2) The municipality shall certify that a registered professional engineer will be responsible for the design and construction of the project and it shall follow standard construction practices, such as bonding of engineers and contractors, requiring errors and omissions insurance, performing testing and inspections during construction, and obtaining as-built drawings.
(3) For a project funded with state lottery proceeds, the municipality shall comply with ORS 280.518 for public display of information on lottery funding of the project. At a minimum the municipality shall:
(4) For a construction project the municipality shall have a plan for ongoing operation, maintenance, and replacement that will preserve the project's benefits over its useful life.
Statutory/Other Authority: ORS 285B.563 & 285A.075
Statutes/Other Implemented: ORS 285B.560 - 285B.599