Oklahoma Administrative Code
Title 785 - Oklahoma Water Resources Board
Chapter 35 - Well Driller and Pump Installer Licensing
Subchapter 11 - Plugging and Capping Requirements for Wells and Test Holes
Section 785:35-11-2 - Plugging requirements for site assessment observation wells, monitoring wells and geotechnical borings
Current through Vol. 42, No. 1, September 16, 2024
(a) Monitoring wells, direct push monitoring wells and site assessment observation wells. Monitoring wells, direct push monitoring wells and site assessment observation wells shall be plugged to prevent pollution of groundwater within three (3) days after completion of use or immediately if drilled by an unlicensed or uncertified person or if the Board determines that the well does not meet the minimum construction standards set forth in this Chapter. The following are minimum requirements for plugging monitoring wells and site assessment observation wells, and the owner of such wells or other federal or state agency may specify more stringent requirements:
(b) Geotechnical borings except direct push geotechnical borings. Geotechnical borings shall be plugged to prevent pollution of groundwater within thirty (30) days after completion of drilling or immediately if drilled by an unlicensed or uncertified person or if the Board determines that the well does not meet the minimum construction standards set forth in this Chapter. The following are minimum requirements for plugging geotechnical borings, and the owner of the boring or other federal or state agency may specify more stringent requirements:
(c) Direct push geotechnical borings. Direct push geotechnical borings shall be plugged to prevent pollution of groundwater within thirty (30) days after completion of drilling or immediately if drilled by an unlicensed or uncertified person or if the Board determines that the well does not meet the minimum construction standards set forth in this Chapter as follows:
(d) Cement grout requirements. If cement grout is used, the grout shall have a mix ratio of one 94 pound sack of cement to a maximum of six U.S. gallons of water.
(e) Abandonment after equipment removed. If a site assessment observation well, monitoring well or geotechnical boring is abandoned after the drilling equipment has been removed from the site, responsibility for proper plugging within the applicable time period specified in this section shall lie with the owner of the land where the well or boring is located
Revoked and reenacted at 9 Ok Reg 1679, eff 5-11-92 ; Amended at 10 Ok Reg 3299, eff 6-25-93 ; Amended at 11 Ok Reg 2947, eff 6-13-94 ; Amended at 12 Ok Reg 2703, eff 7-1-95 ; Amended at 15 Ok Reg 2440, eff 6-11-98 ; Amended at 16 Ok Reg 2686, eff 7-1-99 ; Amended at 19 Ok Reg 2498, eff 6-27-02 ; Amended at 20 Ok Reg 2608, eff 7-11-03 ; Amended at 21 Ok Reg 2632, eff 7-1-04 ; Amended at 22 Ok Reg 1598, eff 7-1-05 ; Amended at 23 Ok Reg 3078, eff 7-27-06 ; Amended at 25 Ok Reg 1444, eff 5-27-08 ; Amended at 27 Ok Reg 1313, eff 5-27-10 ; Amended at 30 Ok Reg 895, eff 6-13-13