(a) Alternatives. Instead of upgrading the dam using structural methods, an owner may seek to implement alternative methods. Such alternative methods shall include but is not limited to the following:
(1) a current breach
analysis and hydrologic study that demonstrates a lesser hazard-potential
classification is correct; or
(2) a
current breach analysis and design flood analyses that demonstrate existing
downstream developments would not be adversely affected by more than one foot
difference between breach and non-breach simulations in the affected area, or
records showing the downstream development has been dedicated to
non-residential and non-commercial use; or
(3) a plan to permanently remove the
dam.
(b) Schedule of Compliance. An owner may seek a compliance schedule with the Board that sets the timeframes for various stages of work to be performed. In considering such applications to upgrade on a compliance schedule the Board shall evaluate whether the current dam will not significantly affect the public safety during the compliance period.
Added at 27 Ok Reg 1300, eff 5-27-10
Disclaimer: These regulations may not be the most recent version. Oklahoma may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.