Section 785:20-9-1 - Construction of works
Current through Vol. 42, No. 1, September 16, 2024
(a) Time for beginning of construction.
(b) Amendment of construction plans.The plans of construction may be amended by the permittee, with the approval of the Board, at any time, [82:105.10] upon approval of a petition, but no change shall authorize an extension of time for construction or placing the water to beneficial use beyond that authorized in the permit, except as provided in 82 O.S. 1981, §105.15, and rules in this Chapter.
(c) Extension of time for beginning of construction.Upon written request by the permittee the Board may extend the time for the beginning of construction beyond the time allowed in the permit for good cause shown, such as engineering difficulty or other valid reason over which the applicant has no control; [82:105.15] provided that no extension shall be granted beyond seven (7) years or beyond the first time step of a schedule of use, whichever is longer.
(d) Notice of completion of works. Within ten (10) days following completion of the works, a regular, seasonal or term permittee shall give notice on forms previously provided by the Board, that the work has been completed. If the works were constructed prior to obtaining a permit to appropriate, the permittee shall file a notice of completion of works within ten (10) days after receiving the permit and notice form.
(e) Inspection of works.Upon due notice of completion by the owner, the Board shall make an inspection of the works which shall be thorough and complete in order to determine the actual capacity of the works and their safety and efficiency. [82:105.25] Inspections of dams are governed by the provisions of Chapter 25 of this Title. Inspection fees shall be as set forth in Chapter 5 of this Title and shall be due on the date set forth in the invoice sent to the permittee.
(f) Improperly constructed works to be changed.If not properly and safely constructed, the Board may require the necessary changes and shall give notice of the changes to be made within a reasonable time and shall not issue a certificate of completion until such changes are made. [82:105.25]
(g) Postponement of priority for failure to make necessary changes.Failure to make necessary changes within the time required by the Board shall cause the postponement of the priority under the permit for such time as may elapse from the date for completing such changes until made to the satisfaction of the Board, and applications subsequent in time shall have the benefit of such postponement of priority. [82:105.25]
(h) Report by registered professional engineer accepted.The Board may accept the report of inspection by a registered professional engineer. [82:105.25]
(i) Certificate of completion.