Oklahoma Administrative Code
Title 730 - Department of Transportation
Chapter 50 - Size and Weight Permits
Subchapter 5 - Size and Weight Permit Load
Section 730:50-5-22 - Agriculture permits

Universal Citation: OK Admin Code 730:50-5-22

Current through Vol. 42, No. 1, September 16, 2024

Agriculture permits shall be governed by 47 O.S. §14-118(e).

(1) Transporting of raw forest products shall not be permitted on the National System of Interstate and Defense Highways and shall require:

(A) An annual permit with a fee of Twenty-five Dollars ($25.00)

(B) Truck and trailer information shall be given to the Size and Weight Permit Division of the Department of Transportation.

(C) The regulation "Oversize Load" sign and flagging are required, as provided in 730:50-5-15.

(2) Transporting of round baled hay requires:

(A) An annual permit with a fee of Twenty-five Dollars ($25.00).

(B) Truck and trailer information shall be given to the Size and Weight Permit Division of the Department of Transportation.

(C) The regulation "Oversize Load" sign and flagging are required, as provided in 730:50-5-15.

(3) Transporting of soil conservation equipment requires:

(A) An annual permit with a fee of Twenty-five Dollars ($25.00).

(B) Truck and trailer information shall be given to the Size and Weight Permit Division of the Department of Transportation.

(C) Travel on the National System of Interstate and Defense Highways shall not be permitted.

(D) The regulation "Oversize Load" sign and flagging are required, as provided in 730:50-5-15.

Disclaimer: These regulations may not be the most recent version. Oklahoma may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.