(A) Certified
building department fees. Fees for construction documents submitted to and
inspections made by certified building departments shall be in accordance with
the locally adopted fee schedule.
(B) Division of industrial compliance
schedule of fees. The fees for examination and processing of construction
documents when required to be submitted to the division of industrial
compliance, except medical gas piping systems and temporary structures, shall
be in accordance with Table B1. The certificate of occupancy or certificate of completion
specified in section 111.1 of rule 4101:1-1-01 of the Administrative Code will not be issued until the applicable fees
have been paid in accordance with Table B1.
Exception: Fees for alteration or change of occupancy as
determined by the building official shall be based on the actual area affected
by the alteration or change of occupancy which may extend beyond the limits of
construction.
Table B1 - DIC Schedule of Fees
Scope of Work
|
Processing Fee
|
Fee for Plans Examination and a minimum of Five
Inspections
|
(1) Structural
|
$ 275.00
|
$ 10.50 /100 sq. ft. gross area of each floor
level
|
(2) Mechanical
|
$ 275.00
|
$ 6.50 /100 sq. ft. gross area of each floor
level
|
(3) Electrical
|
$ 275.00
|
$ 6.50 /100 sq. ft. gross area of each floor
level
|
(4) Fire alarm systems
|
$ 275.00
|
$ 6.50 per device
|
(5) Automatic sprinkler and other fire suppression
systems (all suppressed areas)
|
$ 275.00
|
$ 6.50 /100 sq. ft. gross area of each floor
level
|
(6) Industrial unit
|
$ 200.00
|
$ 1.75 /100 sq. ft. gross area of each floor
level
|
(1)
Alternative review. The division of
industrial compliance may establish a written policy for the alternative
examination and processing of construction documents. The policy shall comply
with rule 4101:1-1-01 of the Administrative Code. The fee for the examination and processing of construction documents in accordance with the policy shall be in addition to fees otherwise required by this rule but shall not exceed two hundred seventy-five dollars per each scope of work listed in Tables B1 and B2.
(2)
Additional
inspections. The division of industrial compliance may establish a written
policy for the maximum number of inspections required by sections 108.2 and
105.1.5 of rule 4101:1-1-01 of the Administrative Code that may be included in the fees set forth in Table B1. Inspections in excess of the maximum number established by the division of industrial compliance shall be subject to fee of one hundred fifty dollars per inspection.
(3) Resubmissions. The fees set forth in Table B1
shall include one initial plan review and up to two resubmission plan reviews
to resolve issues resulting from correction letters. The fee for plan review
after the second resubmission shall be of one hundred dollars for each
additional resubmission.
(4) Re-stamping. The
processing fee for re-stamping additional sets of construction documents after
initial plan approval shall be one hundred dollars.
(5) Amended
construction documents. The processing fee for amended construction documents
submitted to the division of industrial compliance in accordance with section
106.3 of rule 4101:1-1-01 of the Administrative Code shall be two hundred fifty dollars. The fee for plans examination of amended construction documents submitted to the division of industrial compliance in accordance with section 106.3 of rule 4101:1-1-01 of the Administrative Code shall be one hundred dollars per hour for each submission.
(6) Phased plan approval. The fees for plan
examination and processing of a phased plan approval request per section
105.1.4 of rule 4101:1-1-01 of the Administrative Code shall be in accordance with Table B1 and paragraph (B)(1) for the initial phase submission of each scope of work. The processing fee for plan examination of each subsequent phase of submission shall be two hundred fifty dollars.
(7) Medical gas piping systems. The fees for
examination and processing of construction documents for medical gas piping
systems when required to be submitted to the division of industrial compliance
shall be in accordance with Table B2.
(a)
Additional inspections. The division of industrial compliance may establish a
written policy for the maximum number of inspections required by sections 108.2
and 105.1.5 of rule 4101:1-1-01 of the Administrative Code that may be included in the fees set forth in Table B2 for medical gas piping systems. Inspections in excess of the maximum number established by the division of industrial compliance shall be subject to a fee of one hundred fifty dollars per inspection.
Table B2 - DIC Medical Gas Schedule of Fees
Medical Gas Piping System Processing, Plans
Examination, and Inspections
|
Fee (includes a minimum of two inspections)
|
Processing
|
$ 275.00
|
Plans Examination
|
$ 275.00
|
Per room (with outlets) and equipment rooms
|
$ 10.00
|
Per zone valve assembly
|
$ 25.00
|
Per system
|
$ 25.00
|
Per "tie-in"
|
$ 25.00
|
(8) Temporary
structure fee. The fee for the review and inspection of temporary structures as
referenced in section 102.8 of rule 4101:1-1-01 of the Administrative Code shall be one hundred fifty dollars
per each scope of work. This fee allocates one inspection for each scope of
work. The fee for inspections after normal business hours shall be one hundred
thirty dollars per hour.
(9) Preliminary
review. The fee for preliminary construction document examination for the
purpose of determining compliance with the provisions of the rules of the board
by the division of industrial compliance shall be one hundred thirty dollars
per hour.
(10) Inspection fees. The fee for each inspection
during normal business hours, other than those required by section 108.2 and
105.1.5 of rule 4101:1-1-01 of the Administrative Code, shall be one hundred fifty dollars per inspection.
The fee for inspections conducted after normal business hours
shall be one hundred thirty dollars per hour. Requests for all inspections
shall be in writing to the division of industrial compliance and the fee shall
be paid prior to the inspection.
Fees for an application pursuant to section 105.1.5 of rule 4101:1-1-01 of the Administrative Code shall include a processing fee of one hundred fifty dollars. The fee for periodic inspections conducted by the division of industrial compliance shall include the hourly inspection rate and expenses such as food, lodging, and administrative costs. All such fees shall be paid by the holder of an annual approval.
(11) Reinspection
fee. The fee for each reinspection shall be one hundred fifty dollars. A
reinspection shall be required when the inspector must return to inspect work
that was not ready or had failed a previous inspection.
(12)
Related fees. In addition to the fees required by this rule, the superintendent of
the division of industrial compliance shall collect a fee, on behalf of the
board of building standards, of five dollars for
making inspections and each application for
acceptance and approval of construction documents per scope of work.
The fee shall be deposited by the division of industrial
compliance, pursuant to section
121.084
of the Revised Code, to the credit of the board. The superintendent of the
division shall report on the amount of the fees collected and deposited to the
credit of the board not later than forty-five days following the end of the
first full month's collection and then monthly afterward.
(13)
Late fee. Any person who fails to pay an inspection fee required for any
inspection conducted by the department of commerce pursuant to Chapters 3781.
and 3791. of the Revised Code, except for fees charged for the examination and
processing of construction documents, within forty-five days after the
inspection is conducted shall pay a late payment fee equal to twenty-five per
cent of the inspection fee.
(14) Certificate of
occupancy or certificate of completion. The fee for each certificate of
occupancy or certificate of completion issued in accordance with section 111 of
rule 4101:1-1-01 of the Administrative Code shall be sixty-five dollars.
Exception: There shall be no fee for each certificate of
occupancy issued in accordance with section 111.4 of rule 4101:1-1-01 of the Administrative Code for existing buildings.
(15) Annual approval
for alterations. The fee for each annual approval for an individual applicant
issued in accordance with section 105.1.5 of rule 4101:1-1-01 of the Administrative Code shall be six hundred fifty dollars.
(16)
Welding and brazing procedure specification review. The fee for the review of
each piping welding and brazing specification submitted in accordance with
section 313.5 of rule 4101:2-3-01 of the Administrative Code and section 317.5 of rule 4101:3-3-01 of the Administrative Code shall be sixty dollars.
(17) Welding and
brazing procedure qualification record review. The fee for the review of each
procedure qualification record submitted in accordance with section 313.5 of
rule 4101:2-3-01 of the Administrative Code and section 317.5 of rule 4101:3-3-01 of the Administrative Code shall be fifteen dollars.
(18) Welding and
brazing performance qualification review. The fee for the review of each
performance qualification submitted in accordance with section 313.5 of rule 4101:2-3-01 of the Administrative Code and section 317.5 of rule 4101:3-3-01 of the Administrative Code shall be fifteen dollars.