Ohio Administrative Code
Title 1501:9 - Division of Mineral Resources Management - Oil and Gas
Chapter 1501:9-11 - Plugging of Wells
Section 1501:9-11-03 - Objective and methods
Current through all regulations passed and filed through September 16, 2024
(A) Any proposed plugging plan or plugging activity will be designed to accomplish all of the following: isolate oil, natural gas, hydrogen sulfide, brine, water, or other fluids to the reservoir rock in which it occurs or originates; isolate mineable coal seams; and prevent movement of fluids into or between underground sources of drinking water.
Prior to the use of the bullhead squeeze method, integrity of the casing has been verified by testing witnessed by a division inspector;
(B) The chief may authorize alternate methods of plugging not specified in Chapter 1501:9-11 of the Administrative Code so long as the plugging method complies with Chapter 1509. of the Revised Code and rules adopted under it. The chief also may direct a person to install casing or a vault and a vent pipe to provide additional safety.
(C) If in production or drilling operations a wellbore becomes obstructed because of lost tools or equipment that cannot be recovered by reasonable attempts, a person will have to submit a written plugging plan that accomplishes the objectives of this rule. The plugging report will include documentation of the exact method of plugging and the equipment lost.
(D) The chief may order the immediate suspension of plugging activities if a person may cause or is causing, may engage in or is engaging in, may maintain or is maintaining a condition or activity that presents an imminent danger to underground miner safety, public health or safety, or results in or is likely to result in damage to the environment or natural resources.