North Dakota Administrative Code
Title 43 - Industrial Commission
Article 43-02 - Mineral Exploration and Development
Chapter 43-02-13 - High-Level Radioactive Waste
Section 43-02-13-20 - Geologic data

Current through Supplement No. 392, April, 2024

The following basic data collected by the operator must be delivered, free of charge, to the state geologist within thirty days of collection:

1. Washed and packaged sample cuts.

2. Cores, except those portions used for necessary testing or analysis, in which case the results of testing, the analysis, and the description of missing portions must be submitted to the state geologist.

3. Copies of all logs, including sample logs, radioactivity logs, resistivity logs, and other types of electrical or mechanical logs.

4. Elevation and location information on the data collection points.

5. Other pertinent information required by the state geologist.

General Authority: NDCC 38-23-03

Law Implemented: NDCC 38-23-03

Disclaimer: These regulations may not be the most recent version. North Dakota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.