1. The operator of a well shall maintain all existing dikes or firewalls installed before July 1, 2013, and shall keep the containment area free of oil, emulsions, waste products, stored products, tank bottoms, brine, water, vegetation, debris, or any flammable or combustible material.

2. The director may require surface facilities constructed before July 1, 2013, to be upgraded to meet secondary containment requirements of this chapter if the facility is substantially modified or if losses have resulted in pollution.

3. Before any modification of a secondary containment area, other than routine maintenance, the operator of a well shall notify the director in writing. The notification shall include a modified secondary containment plan reflecting the proposed changes. The operator shall receive approval from the director before making the modification. The director shall approve or deny the request within eleven days of receipt of the request. The director may require an inspection of the modified secondary containment area before it is returned to service.

General Authority: NDCC 38-12-02

Law Implemented: NDCC 38-12-02

Disclaimer: These regulations may not be the most recent version. North Dakota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.