North Dakota Administrative Code
Title 43 - Industrial Commission
Article 43-02 - Mineral Exploration and Development
Chapter 43-02-01 - Coal Exploration
Section 43-02-01-14 - Method of plugging

Current through Supplement No. 392, April, 2024

Before any testhole is abandoned, all of the cuttings possible must be returned to the testhole, and it shall be plugged in such a manner as to prevent the intrusion of any foreign material. Any cuttings not returned to the hole must be spread at the surface, if approved by the landowner, or properly disposed of off the testhole site, if approved by the owner of the disposal site. The plugging shall be accomplished immediately when all desired information has been obtained.

If a testhole penetrates water bearing sands it shall be plugged with cement or some other method approved by the state geologist, in such a manner as to permanently confine the water to its original stratum.

General Authority: NDCC 38-12.1-04

Law Implemented: NDCC 38-12.1-04

Disclaimer: These regulations may not be the most recent version. North Dakota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.