North Carolina Administrative Code
Title 21 - OCCUPATIONAL LICENSING BOARDS AND COMMISSIONS
Chapter 56 - ENGINEERS AND SURVEYORS
Section .1600 - STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA
Section 56 .1608 - CLASSIFICATION/LAND INFORMATION SYSTEM/GEOGRAPHIC INFORMATION SYSTEM SURVEYS
Current through Register Vol. 39, No. 6, September 16, 2024
(a) General: "Land Information System/Geographic Information System (LIS/GIS)" surveys are defined as the measurement of existing surface and subsurface features for the purpose of determining their accurate geospatial location for inclusion in an LIS/GIS database. All LIS/GIS surveys as they relate to property lines, rights-of-way, easements, subdivisions of land, the position for any survey monument or reference point, the determination of the configuration or contour of the earth's surface or the position of fixed objects thereon, and geodetic surveying that includes surveying for determination of the size and shape of the earth both horizontally and vertically and the precise positioning of points on the earth utilizing angular and linear measurements through spatially oriented spherical geometry, shall be performed by a Land Surveyor who is a licensee of this Board unless exempt by G.S. 89C-25. For the purpose of specifying minimum allowable surveying standards, five general classifications of LIS/GIS surveys are established, any of which may be specified by the client. In the absence of a specified standard, the surveyor shall conform the survey to the requirements for a Class B survey.
(b) Nothing in this Rule negates or replaces the relative accuracy standards found in Rules .1601 through .1607 of this Section.
(c) The Professional Land Surveyor in responsible charge of the LIS/GIS boundary or geodetic control survey shall certify all of the following in either written or digital form:
(d) A certificate, substantially in the following form, shall be affixed to all maps or reports:
"I, ______________________, certify that this project was completed under my direct and responsible charge from an actual survey made under my supervision; that this survey was performed to meet the requirements for an LIS/GIS survey [21 NCAC 56.1608] to the accuracy of Class ____ and vertical accuracy; when applicable to the Class ___ standard method used to evaluate the accuracy was _______________; method of measurement ______________; date(s) of survey ___________; datum used for survey __________; and all coordinates are based on ______________ ['NAD 83' and realization (date of adjustment of coordinate system) or 'NAD 27'] and all elevations are based on ________________ (NGVD 29, NAVD 88, or other)."
Authority
G.S.
89C-10;
89C-20;
Eff. February
1, 1996;
Amended Eff. August 1, 2014; August 1, 2011; July 1, 2009;
May 1, 2009; August 1, 2002; August 1, 2000;
Pursuant to
G.S.
150B-21.3A, rule is necessary without
substantive public interest Eff. April 27,
2019.