North Carolina Administrative Code
Title 15A - Environmental Quality
Chapter 05 - MINING - MINERAL RESOURCES
Subchapter H - OIL AND GAS CONSERVATION
Section .1600 - WELL CONSTRUCTION AND COMPLETION
Section 05H .1611 - WELL INSTALLATION FOR PRODUCTION CASING
Current through Register Vol. 39, No. 6, September 16, 2024
(a) Production casing shall be installed and cemented from the bottom to 200 feet above the base of the previous casing string. Notwithstanding the foregoing, a production zone may be completed using a non-cemented production liner in accordance with Paragraph (c) of this Rule.
(b) Installation of production casing or installation of production liners shall comply with the following:
(c) A production liner may be used as production casing if the following criteria are met:
(d) The production liner top shall be pressure tested to at least 500 psi, for a period of 30 minutes, above the maximum anticipated pressure, as determined by the permittee, in the wellbore during well completion and production operations. If after 30 minutes the pressure has dropped by more than 10 percent, the permittee shall not resume operations until the condition has been corrected and verified by passing a subsequent pressure test.
Authority
G.S.
113-391(a)(5)c;
Eff. March 17, 2015.