North Carolina Administrative Code
Title 15A - Environmental Quality
Chapter 05 - MINING - MINERAL RESOURCES
Subchapter H - OIL AND GAS CONSERVATION
Section .1200 - DRILLING UNITS AND WELL SPACING
Section 05H .1206 - WELL SPACING REQUIREMENTS FOR RESOURCES IN CONVENTIONAL RESERVOIRS

Universal Citation: 15A NC Admin Code 05H .1206

Current through Register Vol. 39, No. 6, September 16, 2024

(a) The drilling of a new oil or gas well in a conventional reservoir, the reopening of an oil or gas well temporarily abandoned pursuant to Rule .1621 of this Subchapter, the deepening, plugging back, or sidetracking of an existing oil or gas well shall conform to the requirements in this Section.

(b) In conventional reservoirs, no portion of the wellbore shall be less than 200 horizontal feet from the boundary of the drilling unit.

(c) A variance may be granted by the Commission to reduce the distance from the boundary of the drilling unit based on reservoir performance to optimize production and minimize waste of the reservoir. The variance, if granted, shall provide equal or greater protection of public health, safety, and the environment.

Authority G.S. 113-391(a)(12);143B-293.1(b);
Eff. March 17, 2015.

Disclaimer: These regulations may not be the most recent version. North Carolina may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.