North Carolina Administrative Code
Title 15A - Environmental Quality
Chapter 02 - ENVIRONMENTAL MANAGEMENT
Subchapter K - DAM SAFETY
Section .0200 - OBTAINING APPROVAL FOR DAM CONSTRUCTION: REPAIR:OR REMOVAL
Section 02K .0209 - DESIGN LIFE OF A DAM AND RESERVOIR
Current through Register Vol. 39, No. 6, September 16, 2024
(a) The selection of materials and equipment to be used in a dam and all of its appurtenant features shall either be based on sufficient quality and durability to satisfactorily function throughout the design life or shall provide for safe and economical replacement within the design life span.
(b) The design life of a dam and reservoir is the period of time the dam and reservoir can be expected to perform effectively as planned. The design life of a dam shall be determined by the following:
Authority
G.S.
143-215.27;
143-215.31;
Eff. June
15, 1980;
Pursuant to
G.S.
150B-21.3A, rule is necessary without
substantive public interest Eff. December 23,
2017.