North Carolina Administrative Code
Title 15A - Environmental Quality
Chapter 02 - ENVIRONMENTAL MANAGEMENT
Subchapter D - AIR POLLUTION CONTROL REQUIREMENTS
Section .0500 - EMISSION CONTROL STANDARDS
Section 02D .0546 - CONTROL OF EMISSIONS FROM LOG FUMIGATION OPERATIONS
Current through Register Vol. 39, No. 6, September 16, 2024
(a) Purpose. The purpose of this Rule is to establish emission control requirements for hazardous air pollutants and toxic air pollutants from log fumigation operations.
(b) Definitions. For the purpose of this Rule, the following definitions and definitions in this Subchapter or 15A NCAC 02Q apply:
(c) Applicability. This Rule shall apply to new, existing, and modified bulk, chamber, and container log fumigation operations that use a hazardous air pollutant or toxic air pollutant as a fumigant.
(d) Emission Control Requirements. The owner or operator of a log fumigation operation shall comply with the Toxic Air Pollutant Guidelines specified in 15A NCAC 02D .1104 and follow the procedures specified in 15A NCAC 02D .1106, 15A NCAC 02Q .0709, and .0710.
(e) The owner or operator shall post signs notifying the public of fumigation operations. The signs shall be visible and legible to the public at the fence or property line closest to a public right-of-way. The signs shall remain in place permanently and shall conform to the format for placards mandated by the federally approved fumigant label.
(f) Monitoring, Recordkeeping, and Reporting. The owner or operator of a bulk, chamber, or container log fumigation operation shall comply with the requirements pursuant to 15A NCAC 02D .0600 and the following requirements:
(g) Compliance Schedule. The owner or operator of an existing log fumigation operation subject to this Rule shall achieve compliance within 60 days after the Rule is effective or in accordance with an alternate compliance schedule approved by the Director. In establishing an alternate compliance schedule, the Director shall consider whether the compliance approach chosen by the facility involves the purchase and installation of a control device. New and modified facilities shall achieve compliance with this Rule upon start-up.
Authority
G.S.
143-215.3(a)(1);
143-215.107(a)(4);
143-215.107(a)(5);
Eff. November 1, 2020.