Current through Register Vol. 39, No. 6, September 16, 2024
(a) The definitions
contained in
G.S.
130A-444 and the following definitions shall
apply throughout this Section:
(1) "Abatement
Designer" means a person who is responsible for planning all phases of an
asbestos abatement design from abatement site preparation through disassembly
of all abatement area barriers and who meets the requirements of Rule .0602(c)
of this Section.
(2) "Abatement
Project Monitoring Plan" means a written project-specific plan for conducting
visual inspections and ambient and clearance air sampling.
(3) "Air Monitor" means a person who
implements the abatement project monitoring plan, collects ambient and
clearance air samples, performs visual inspections, or monitors and evaluates
asbestos abatement, and who meets the requirements of Rule .0602(c) of this
Section.
(4) "Asbestos Abatement
Design" means a written or graphic plan that is prepared by an accredited
abatement designer as defined in Subparagraph (a)(1) of this Rule and that
specifies how an asbestos abatement project will be performed. An asbestos
abatement design shall include, at minimum, the following:
(A) a scope of work and technical
specifications;
(B) the asbestos
abatement designer's signature; and
(C) the accreditation number.
(5) "Completion Date" means the
date on which all activities on a permitted asbestos removal requiring the use
of accredited workers and supervisors are complete, including the disassembly
of all removal area barriers.
(6)
"Emergency Renovation Operation" means the same as defined in 40 CFR Part
61.141 and as adopted in Rule .0609 of this Section.
(7) "Inspector" means a person who examines
buildings or structures for the presence of asbestos containing materials,
collects bulk samples, or conducts physical assessments of the asbestos
containing materials, and who meets the requirements of Rule .0602(c) of this
Section. A person whose asbestos inspection activities are limited to roofing
products is not considered an inspector under this definition if the person is
accredited as a roofing supervisor under this Section.
(8) "Installation" means any building or
structure or group of buildings or structures at a single site under the
control of the same owner or operator.
(9) "Management Planner" means a person who
interprets inspection reports, conducts hazard assessments of asbestos
containing materials, and prepares written management plans, and who meets the
requirements of Rule .0602(c) of this Section.
(10) "Nonscheduled Asbestos Removal" means
the same as nonscheduled renovation operation, as defined in 40 CFR Part
61.141, of asbestos containing material.
(11) "Program" means the Health Hazards
Control Unit within the Division of Public Health.
(12) "Public Area" means as defined in
G.S.
130A-444(7).
(13) "Regulated Asbestos Containing Material"
means the same as defined in 40 CFR Part 61.141 and as adopted in Rule .0609 of
this Section.
(14) "Start Date"
means the date on which activities begin on an asbestos removal project that is
permitted pursuant to Rule .0605 of this Section and that requires the use of
workers and supervisors who are accredited pursuant to Rule .0602 of this
Section, including removal area isolation and preparation or any other activity
which may disturb asbestos containing materials.
(15) "Successfully complete" means that an
individual has attended the initial or refresher training course and passed the
course exam with a score of 70 percent or higher in accordance with Rules .0603
and .0611 of this Section and 40 C.F.R. Part 763, Subpart E, Appendix
C(I)(C)(2).
(16) "Supervising Air
Monitor" means a person who meets the requirements of Rule .0602(c) of this
Section and who prepares a written abatement project monitoring plan and
implements the plan or ensures that the plan is implemented by an air monitor
working under his or her supervision. The supervising air monitor directs,
coordinates, and approves all activities of air monitors working under his or
her supervision. The supervising air monitor may also perform the duties of an
air monitor.
(17) "Supervisor"
means a person who is a "competent person" as defined in
29 CFR
1926.1101(b) and who is an
"on-site representative" as defined in 40 CFR Part 61.145(c)(8) as adopted in
Rule .0609 of this Section and who performs the duties specified
therein.
(18) "Under the direct
supervision" means working under the guidance of an individual who is
accredited pursuant to Rule .0602 of this Section and who is responsible for
all activities performed.
(19)
"Worker" means a person who performs asbestos abatement under the direct
supervision of an accredited supervisor.
(20) "Working day" means Monday through
Friday, including any holidays.
(21) "Class II Asbestos Work" means as
defined in 29 CFR
1926.1101(b).
(22) "Roofing Worker" means a person whose
duties regarding asbestos are limited to Class II asbestos work involving the
removal of roofing products that are classified as regulated asbestos
containing material and who works under the direct supervision of a roofing
supervisor.
(23) "Roofing
Supervisor" means a supervisor as defined in Subparagraph (a)(16) of this Rule,
whose duties regarding asbestos are limited to Class II asbestos work involving
only roofing products that are classified as regulated asbestos containing
material. This person may also perform asbestos roofing inspection activities
which are limited to roofing products, including the collection of bulk
samples.
(24) "Roofing Products"
means bituminous built-up roofing systems, roofing membranes, asphalt shingles,
cement shingles, roofing cements, mastics, coatings, panels, light weight
roofing concrete, and flashings.
(b) In addition to the rules of this Section,
asbestos management activities shall comply with the Asbestos Hazard Emergency
Response Act (AHERA) as defined at
G.S.
130A-444(1) and 40 CFR Part
763, Subpart E and Appendices, which are hereby incorporated by reference,
including any subsequent amendments and editions, and available free of charge
at: https://www.ecfr.gov/.
(c) For the purposes of this Section,
29 CFR
1926.1101 is hereby incorporated by
reference, including any subsequent amendments and editions, and available free
of charge at https://www.ecfr.gov/.
Authority G.S. 130A
5(3); 130A 451;
Temporary Amendment Eff. November 8, 1994 for a
period of 180 days or until the permanent rule becomes effective, whichever is
sooner;
Temporary Amendment Eff. November 1, 1989 for a period of
180 days to expire on April 30, 1990;
Temporary Rule Eff. October
28, 1988 for a period of 180 days to expire on April 26, 1989;
Eff.
March 1, 1989;
Amended Eff. July 1, 1996; January 1, 1995; October
1, 1994; August 1, 1991; February 1, 1990;
Readopted Eff. January
1, 2021.