(a) All persons exempt from certification under G.S. 62-110.1(g) shall file with the Commission a report of the proposed construction of an electric generating facility before beginning construction of the facility. The report shall be in the form adopted by the Commission, shall include the information prescribed in subsection (g) below, and shall be signed and verified by the owner of the electric generating facility or by an individual duly authorized to act on behalf of the owner for the purpose of the filing. The facility owner shall also be required to report to the Commission the completion of each such facility by giving notice of the completion of construction to the Commission in accordance with section (i) of this Rule. Reports of proposed construction and notices of completion of construction shall be for informational purposes only, and shall not require action by the Commission or the Public Staff.
(b) Reports filed on behalf of a corporation are not subject to the provision of Rule R1-5(d) that requires corporate pleadings to be filed by a member of the Bar of the State of North Carolina. Should a public hearing be required, the requirements of G.S. 84-4 and G.S. 84-4.1 shall be applicable.
(c) The owner of the electric generating facility shall provide a copy of the report to the electric public utility, electric membership corporation, or municipality to which the generating facility is or will be interconnected. This requirement shall not apply to an offering utility, as defined in G.S. 62-126.3(10), with regard to an electric generating facility that is intended to be a community solar energy facility, as defined in G.S. 62-126.3(3).
(d) The owner of the electric generating facility shall file the report electronically or file an original of the report of proposed construction with the Chief Clerk of the Utilities Commission. The report shall be accompanied by the fee required by G.S. 62-300.
(e) Upon the filing of a report of proposed construction, the Chief Clerk will assign a new docket or sub-docket number to the filing.
(f) The Commission may order a hearing on the report of proposed construction upon its own motion or upon receipt of a complaint specifying the basis thereof. Otherwise, no acknowledgment of receipt of the report of proposed construction will be issued nor will any other further action be taken by the Commission.
(g) The Report.
(i) Notice of completion of construction of facility. Within thirty (30) days of the completion of construction of the facility, each facility owner shall notify the Commission that the construction of the facility is complete. This notice shall be made by filing a short, plain statement that construction of the facility is complete and the date on which the construction was completed.
NCUC Docket No. E-100, Sub 113, 2/29/08; NCUC Docket No. E-100, Subs 113 & 121, 1/31/11; NCUC Docket No. M-100, Sub 136, 6/26/12; NCUC Docket No. E-100, Sub 134, 3/18/2015; NCUC Docket Nos. E-100, Subs 113, 121, & 134, 03/29/2018; NCUC Docket Nos. E-100, Sub 113, & M-100, Sub 158, 08/26/2020.