Section 11 R06-26 - TEST PROCEDURES AND ACCURACIES
Current through Register Vol. 39, No. 6, September 16, 2024
(a) Meters and/or associated metering devices shall be tested at the points and adjusted to the tolerances prescribed below. The test of any unit of metering equipment shall consist of a comparison of its accuracy with the accuracy of a standard. The Commission will use the applicable provisions of the standards listed in Rule R6-21 as criteria of accepted good practice in testing meters.
(b) Positive Displacement Meters.
Flow |
Adjusted to within |
Check flow |
98.5%-100.5% |
Not less than full rated flow |
98.5%-100.5% |
(c) Orifice Meters. - Accuracy at test points must be within 1/2%, plus or minus.
(d) Timing Devices. - All recording type meters or associated instruments which have a timing element that serves to record the time at which the measurement occurs must be adjusted so that the timing element is not in error by more than plus or minus 4 minutes in 24 hours.
(e) General.