New York Codes, Rules and Regulations
Title 21 - Miscellaneous
Chapter XI - New York State Energy Research And Development Authority
Part 508 - Green Residential Building Program
Section 508.9 - Application for program incentive
Universal Citation: 21 NY Comp Codes Rules and Regs ยง 508.9
Current through Register Vol. 46, No. 12, March 20, 2024
(a) For an owner to receive a program incentive for a residential building with qualified occupied square footage, such owner shall submit an application before October 31, 2013, which shall include the following information:
(1) name
and address of owner;
(2)
residential building address(es);
(3) designation of the residential building
as single family detached, townhouse, or multi-family and method of
construction as built on-site, modular, or manufactured;
(4) for residential buildings with more than
one dwelling unit, number of dwelling units for which a program incentive is
requested and the total number of dwelling units in the structure;
(5) qualified occupied square footage of the
dwelling unit;
(6) a copy of the
certificate(s) of occupancy or a certificate(s) of completion;
(7) a copy of the residential building's:
(i) second or higher level LEED certification
based on the LEED for Homes Rating System or LEED for New Construction Rating
System; or
(ii) second or higher
level NGBS certification;
(8) a written description of the work
performed that earned the incentive, which shall include but not be limited to
design and construction techniques used to obtain the points necessary to
obtain the LEED or NGBS certification and the minimum energy efficient
specifications and performance specifications;
(9) for residential buildings of not more
than three stories containing four or fewer dwellings, with central air
conditioners or heat pumps, a copy of the technician's determination on room
airflows;
(10) a copy of the
written records of inspections performed in accordance with the requirements of
sections
508.5
and
508.7
of this Part;
(11) a copy of
documentation showing that all technicians performing inspections meet the
qualifications specified in section
508.8
of this Part; and
(12) a copy of
documentation showing that the builder meets the training requirements
specified in section
508.8
of this Part.
(b) Upon receipt of an application, if the authority determines that the application is incomplete, the authority shall notify the owner within 45 days of receipt of the application and describe the information that is needed to complete the application.
Disclaimer: These regulations may not be the most recent version. New York may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.