New York Codes, Rules and Regulations
Title 16 - DEPARTMENT OF PUBLIC SERVICE
Chapter III - GAS UTILITIES
Subchapter C - Safety
Part 255 - Transmission And Distribution Of Gas
Operations
Section 255.611 - Change in class location: confirmation or revision of maximum allowable operating pressure
Current through Register Vol. 47, No. 12, March 26, 2025
(a) Within 60 days after the required study is completed, the operator shall submit a program for redesigning and/or testing the respective pipeline segments, or appropriate reduction of the maximum certified operating pressures thereof, to conform to the respective then current class locations, in accordance with this Part, or declare that the design, testing, and operation of the respective pipeline segments conform to the respective then current class locations.
(b) Where the hoop stress corresponding to the established maximum allowable operating pressure of a segment of pipeline is not commensurate with the present class location, and the segment is in satisfactory physical condition, the maximum allowable operating pressure of that segment of pipeline must be confirmed or revised.
(c) Confirmation or revision of the maximum allowable operating pressure of segment of pipeline in accordance with this section does not preclude the application of sections 255.553 and 255.555 of this Part.
(d) Confirmation or revision of the maximum allowable operating pressure that is required as a result of a study under section 255.609 of this Part must be completed within 18 months of the change in class location.
(e) Pressure reduction under paragraph (b)(2) of this section within the 18- month period does not preclude establishing a maximum allowable operating pressure under paragraph (b)(3) of this section at a later date.