New York Codes, Rules and Regulations
Title 12 - DEPARTMENT OF LABOR
Chapter I - Industrial Board Of Appeals
Subchapter A - The Industrial Code
Part 4 - Low Pressure Boilers
Subpart 4-6 - Installations, Repairs And Replacement Of Low Pressure Heating System Boilers
- Section 4-6.1 - Responsibility of owner
- Section 4-6.2 - Responsibility of installers and repairers
- Section 4-6.3 - Clearance for boilers installed before march 31, 1965
- Section 4-6.4 - Clearance for boilers installed after march 31, 1965 in a space or room not previously used to house a boiler
- Section 4-6.5 - Clearance for boilers installed after march 31, 1965 in a space or room which previously housed a boiler
- Section 4-6.6 - Working platforms and ladders-boilers installed after march 31, 1965
- Section 4-6.7 - Access for inspection-water tube type boilers installed after march 31, 1965
- Section 4-6.8 - Requirement for boiler room exits-boilers installed after march 31, 1965
- Section 4-6.9 - Requirements for boiler room exits-boilers installed before march 31, 1965
- Section 4-6.10 to 4-6.11 - Renumbered
Disclaimer: These regulations may not be the most recent version. New York may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.