The owner or user shall prepare a boiler for hydrostatic pressure test in the following manner:

(a) The boiler shall be filled with water to the stop valve.

(b) The connections of such boiler when connected with other boilers that are under steam pressure shall be blanked off.

Exception:Where double stop valves are installed in all connecting pipes with open drains between, such connections need not be blanked off.

Disclaimer: These regulations may not be the most recent version. New York may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.