New York Codes, Rules and Regulations
Title 12 - DEPARTMENT OF LABOR
Chapter I - Industrial Board Of Appeals
Subchapter A - The Industrial Code
Part 14 - Construction, Installation, Inspection And Maintenance Of High Pressure Boilers; Construction Of Unfired Pressure Vessels
Subpart 14-2 - Inspection
Section 14-2.3 - Preparation for hydrostatic test
Universal Citation: 12 NY Comp Codes Rules and Regs § 14-2.3
Current through Register Vol. 47, No. 12, March 26, 2025
The owner or user shall prepare a boiler for hydrostatic pressure test in the following manner:
(a) The boiler shall be filled with water to the stop valve.
(b) The connections of such boiler when connected with other boilers that are under steam pressure shall be blanked off.
Exception:Where double stop valves are installed in all connecting pipes with open drains between, such connections need not be blanked off.
Disclaimer: These regulations may not be the most recent version. New York may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.