New Mexico Administrative Code
Title 20 - ENVIRONMENTAL PROTECTION
Chapter 7 - WASTEWATER AND WATER SUPPLY FACILITIES
Part 7 - REVIEW PROCEDURES FOR WASTEWATER CONSTRUCTION LOANS
Section 20.7.7.11 - OVERVIEW
Current through Register Vol. 35, No. 18, September 24, 2024
The process for conducting an environmental review of wastewater facility construction projects includes the following steps.
A. Consultation. The applicant is encouraged to consult with NMED early in project formulation or the facilities planning stage to determine whether a project is eligible for a categorical exclusion from the remaining substantive environmental review requirements of these procedures, to determine alternatives to the proposed project for evaluation, to identify potential environmental issues, and to determine the potential need for partitioning the environmental review process or the need for an Environmental Impact Statement (EIS).
B. Determining categorical exclusion eligibility. At the request of an applicant, NMED will determine if a project is eligible for a categorical exclusion in accordance with the submission of a loan application and other documents submitted to NMED to substantiate the request.
C. Documenting environmental information. If the project is determined to be ineligible for a categorical exclusion, or if no request for a categorical exclusion is made, the potential applicant subsequently prepares an Environmental Information Document (EID) for the project.
D. In the event that the proposed action is of a limited nature, but does not qualify for a categorical exclusion, and that an EID had been approved previously by the EPA or NMED for wastewater facilities, the responsible official may determine to what extent updated information may suffice to provide the requisite environmental review of the project.
E. Assessing environmental impacts. NMED reviews the EID, prepares an environmental assessment (EA), and based upon an assessment of the environmental impacts of the proposed project NMED:
F. Monitoring. The construction and post-construction operation and maintenance of the facilities are monitored to ensure implementation of mitigation measures identified in the FONSI or ROD.