Current through Register Vol. 35, No. 18, September 24, 2024
A. Any owner or operator who begins actual
construction or operates a source or modification without, or not in accordance
with, a permit issued under the requirements of this part shall be subject to
enforcement action.
B. The issuance
of a permit does not relieve any person from the responsibility of complying
with the provisions of the Air Quality Control Act, sections
74-2-1 to
74-2-17,
NMSA 1978; any applicable regulations of the board; and any other requirements
under local, state, or federal law.
C. Approval to construct shall become invalid
if: 1) construction is not commenced within eighteen (18) months after receipt
of such approval; 2) if construction is discontinued for a period of eighteen
(18) months or more; or 3) if construction is not completed within a reasonable
time. For a phased construction project, each phase must commence construction
within eighteen (18) months of the projected and approved commencement date.
The secretary may extend the eighteen (18) month period upon a satisfactory
showing that an extension is justified.
D. If a source or modification becomes a
major stationary source or major modification solely due to a relaxation in any
enforceable limitation (which limitation was established after August 7, 1980),
on the capacity of the source or modification otherwise to emit a pollutant,
such as a restriction on hours of operation, then this part shall apply to the
source or modification as though construction had not yet commenced.
E. Except as otherwise provided in Paragraph
(6) under this subsection (Subsection E of 20.2.74.300 NMAC), the following
specific provisions apply with respect to any regulated NSR pollutant emitted
from projects at existing emissions units at a major stationary source (other
than projects at a source with a PAL) in circumstances where there is a
reasonable possibility, within the meaning of Paragraph (6) under this
subsection (Subsection E of 20.2.74.300 NMAC), that a project that is not a
part of a major modification may result in a significant emissions increase of
such pollutant, and the owner or operator elects to use the method specified in
Paragraphs (1) through (3) of Subsection AR of 20.2.74.7 NMAC for calculating
projected actual emissions.
(1) Before
beginning actual construction of the project, the owner or operator shall
document and maintain a record of the following information:
(a) a description of the project;
(b) identification of the emissions unit(s)
whose emissions of a regulated new source review pollutant could be affected by
the project; and
(c) a description
of the applicability test used to determine that the project is not a major
modification for any regulated new source review pollutant, including the
baseline actual emissions, the projected actual emissions, the amount of
emissions excluded under Paragraph (3) of Subsection AR of 20.2.74.7 NMAC and
an explanation for why such amount was excluded, and any netting calculations,
if applicable.
(2) If
the emissions unit is an existing electric utility steam generating unit,
before beginning actual construction, the owner or operator shall provide a
copy of the information set out in Paragraph (1) of this subsection to the
department. Nothing in this paragraph shall be construed to require the owner
or operator of such a unit to obtain any determination from the department;
however, necessary preconstruction approvals and/or permits must be obtained
before beginning actual construction.
(3) The owner or operator shall monitor the
emissions of any regulated new source review pollutant that could increase as a
result of the project and that is emitted by any emissions unit identified in
Subparagraph (b) of Paragraph (1) of this subsection; and calculate and
maintain a record of the annual emissions, in tons per year on a calendar year
basis, for a period of 5 years following resumption of regular operations after
the change, or for a period of 10 years following resumption of regular
operations after the change if the project increases the design capacity or
potential to emit of that regulated new source review pollutant at such
emissions unit.
(4) If the unit is
an existing electric utility steam generating unit, the owner or operator shall
submit a report to the department within 60 days after the end of each year
during which records must be generated under Subparagraph (c) of Paragraph (1)
of this subsection setting out the unit's annual emissions during the calendar
year that preceded submission of the report.
(5) If the unit is an existing unit other
than an electric utility steam generating unit, the owner or operator shall
submit a report to the department if the annual emissions, in tons per year,
from the project identified in Paragraph (1) of this subsection, exceed the
baseline actual emissions (as documented and maintained pursuant to
Subparagraph (c) of Paragraph (1) of this subsection) by a significant amount
(as defined in 20.2.74.7 NMAC) for that regulated new source review pollutant,
and if such emissions differ from the preconstruction projection as documented
and maintained pursuant to Subparagraph (c) of Paragraph (1) of this
subsection. Such report shall be submitted to the department within 60 days
after the end of such year. The report shall contain the following:
(a) the name, address and telephone number of
the major stationary source;
(b)
the annual emissions as calculated pursuant to Paragraph (3) of this
subsection; and
(c) any other
information that the owner or operator wishes to include in the report (e.g.,
an explanation as to why the emissions differ from the preconstruction
projection);
(6) a
''reasonable possibility'' under this subsection (Subsection E of 20.2.74.300
NMAC) occurs when the owner or operator calculates the project to result in
either:
(a) a projected actual emissions
increase of at least 50 percent of the amount that is a ''significant emissions
increase,'' as defined under Subsection AX of 20.2.74.7 NMAC (without reference
to the amount that is a significant net emissions increase), for the regulated
NSR pollutant; or
(b) a projected
actual emissions increase that, added to the amount of emissions excluded under
Paragraph (3) of Subsection AR of 20.2.74.7 NMAC, sums to at least 50 percent
of the amount that is a ''significant emissions increase,'' as defined under
Subsection AX of 20.2.74.7 NMAC (without reference to the amount that is a
significant net emissions increase), for the regulated NSR pollutant; for a
project for which a reasonable possibility occurs only within the meaning under
this subparagraph (Subparagraph (b) of Paragraph (6) of Subsection E of
20.2.74.300 NMAC), and not also within the meaning of Subparagraph (a) under
this paragraph (Paragraph (6) of Subsection E of 20.2.74.300 NMAC), then the
provisions in Paragraphs (2) through (5) under this subsection (Subsection E of
20.2.74.300 NMAC) do not apply to the project.
F. The owner or operator of the source shall
make the information required to be documented and maintained pursuant to
Subsection E of this section available for review upon request for inspection
by the department or the general public pursuant to the requirements contained
in
40 CFR
70.4(b)(3)(viii).