A. Upon completion of underground mining, surface work areas which are involved in excavation, disposal of materials or otherwise affected, shall be regraded to approximate original contour. The permittee shall transport, backfill and compact fill material to assure stability or to prevent leaching of toxic pollutants. Barren rock or similar materials excess to the mining operations and which are disposed on the land surface shall be subject to the provision of Section 717.15 of this Part. Roads and support facility areas existing prior to the effective date of this Part and used in support of underground mining operations which are subject to this Part shall be regraded to the extent deemed feasible by the regulatory authority based on the availability of backfill material and resulting stability of the affected lands after reclamation. As a minimum, the permittee shall be required to:
B. On approval by the regulatory authority and in order to conserve soil moisture, ensure stability, and control erosion on final graded slopes, cut-and-fill terraces may be allowed if the terraces are appropriate substitutes for construction of lower grades on the reclaimed lands. The terraces shall meet the following requirements:
C. All surface operations on steep slopes of 20 degrees or more or on such lesser slopes as the regulatory authority define as a steep slope shall be conducted so as not to place any material on the downslope below road cuts, mine working or other benches, other than in conformance with Paragraph (a)(1) [now Paragraph 1 of Subsection A of 19.8.36.39 NMAC] of this Part.
D. Regrading or stabilizing rills and gullies. When rills or gullies deeper than 9 inches form in areas that have been regraded and the topsoil replaced but vegetation has not yet been established, the permittee shall fill, grade or otherwise stabilize the rills and gullies and reseed or replant the areas according to Section 717.20. The regulatory authority shall specify that erosional features of lesser size be stabilized if they result in additional erosion and sedimentation.
E. Covering coal and acid-forming, toxic-forming, combustible and other waste materials; stabilizing backfilled materials; and using waste material for fill. Any acid-forming, toxic-forming, combustible materials, or any other waste materials as identified by the regulatory authority that are exposed, used, or produced during underground mining and which are deposited on the land surface shall, after placement in accordance with Section 717.15 of this Part, be covered with a minimum of 4 feet of non-toxic and non-combustible material; or, if necessary, treated to neutralize toxicity, in order to prevent water pollution and sustained combustion, and to minimize adverse effects on plant growth and land uses. Where necessary to protect against upward migration of salts, exposure by erosion, to provide an adequate depth for plant growth, or to otherwise meet local conditions, the regulatory authority shall specify thicker amount of cover using nontoxic material. Acid-forming or toxic-forming material shall not be buried or stored in proximity to a drainage course so as to cause or pose a threat of water pollution or otherwise violate the provisions of Section 717.17 of this Part.
F. Grading along the contour. All final grading, preparation of earth, rock and other nonwaste materials before replacement of topsoil, and placement of topsoil in accordance with Section 717.20 shall be done along the contour to minimize subsequent erosion and instability. If such grading, preparation or placement along the contour would be hazardous to equipment operators, grading, preparation or placement in a direction other than generally parallel to the contour may be used. In all cases, grading, preparation or placement shall be conducted in a manner which minimizes erosion and provides a surface for replacement of topsoil which will minimize slippage.