New Mexico Administrative Code
Title 19 - NATURAL RESOURCES AND WILDLIFE
Chapter 8 - COAL MINING
Part 36 - NEW MEXICO COAL SURFACE MINING REGULATIONS [CSMC 1979-1]
Section 19.8.36.27 - GENERAL PERFORMANCE STANDARDS: TOPSOIL HANDLING (715.16)

Universal Citation: 19 NM Admin Code 19.8.36.27

Current through Register Vol. 35, No. 18, September 24, 2024

To prevent topsoil from being contaminated by spoil or waste materials, the permittee shall remove the topsoil as a separate operation from areas to be disturbed. Topsoil shall be immediately redistributed according to the requirements of Paragraph (b) [now Subsection B of 19.8.36.27 NMAC] of this section on areas graded to the approved postmining configuration. The topsoil shall be segregated, stockpiled and protected from wind and water erosion and from contaminants which lessen its capability to support vegetation if sufficient graded areas are not immediately available for redistribution.

A. Topsoil removal. All topsoil to be salvaged shall be removed before any drilling for blasting, mining or other surface disturbance.

(1) All topsoil shall be removed unless use of alternative materials is approved by the regulatory authority in accordance with Subparagraph (4) [now Paragraph 4 of Subsection A of 19.8.36.27 NMAC]. Where the removal of topsoil results in erosion that may cause air or water pollution, the regulatory authority shall limit the size of the area from which topsoil may be removed at any one time and specify methods of treatment to control erosion of exposed overburden.

(2) All of the A horizon of the topsoil as identified by soil surveys shall be removed according to Paragraph (a) [now Subsection A of 19.8.36.27 NMAC] and then replaced on disturbed areas as the surface soil layers. Where the A horizon is less than six inches, a six-inch layer that includes the A horizon and the unconsolidated material immediately below the A horizon (or all unconsolidated material if the total available is less than six inches) shall be removed and the mixture segregated and replaced as the surface soil layer.

(3) Where necessary to obtain soil productivity consistent with postmining land use, the regulatory authority may require that the B horizon or portions of the C horizon or other underlying layers demonstrated to have comparable quality for root development be segregated and replaced as subsoil.

(4) Slected overburden materials may be used instead of, or as a supplement to, topsoil where the resulting soil medium is equal to or more suitable for vegetation, and if all the following requirements are met:
(a) The permittee demonstrates that the selected overburden materials or an overburden-topsoil mixture is more suitable for restoring land capability and productivity by the results of chemical and physical analyses. These analyses shall include determinations of pH, percent organic material, nitrogen, phosphorus, potassium, texture class and water-holding capacity, and such other analyses as required by the regulatory authority. The regulatory authority also may require that results of field-site trials or greenhouse tests be used to demonstrate the feasibility of using such overburden materials.

(b) The chemical and physical analyses and the results of field-site trails and greenhouse tests are accompanied by a certification from a qualified soil scientist or agronomist.

(c) The alternative material is removed, segregated and replaced in conformance with this Section.

B. Topsoil Redistribution.

(1) Regraded land shall be scarified or otherwise treated to eliminate slippage surfaces and to promote root penetration.

(2) Topsoil shall be redistributed in a manner that:
(a) achieves an approximate uniform thickness consistent with the postmining land uses;

(b) prevents excess compaction of the spoil and topsoil; and

(c) protects the topsoil from wind and water erosion before it is seeded and planted.

C. Topsoil storage. If the permit allows storage of topsoil, the stockpiled topsoil shall be placed on a stable area within the permit area where it will not be disturbed or be exposed to excessive water, wind erosion or contaminants which lessen its capability to support vegetation before it can be redistributed on terrain graded to final contour. Stockpiles shall be selectively placed and protected from wind and water erosion, unnecessary compaction, and contamination by undesirable materials either by a vegetative cover as defined in Section 715.20(g) or by other methods demonstrated to provide equal protection such as snow fences, chemical binders and mulching. Unless approved by the regulatory authority, stockpiled topsoil shall not be moved until required for redistribution on a disturbed area.

D. Nutrients and soil amendments. Nutrients and soil amendments in the amounts and analyses as determined by soil tests shall be applied to the surface soil layer so that it will support the postmining requirements of Section 715.13 and the revegetation requirements of Section 715.20.

Disclaimer: These regulations may not be the most recent version. New Mexico may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.