New Mexico Administrative Code
Title 19 - NATURAL RESOURCES AND WILDLIFE
Chapter 8 - COAL MINING
Part 2 - AREAS DESIGNATED BY ACTS OF CONGRESS
Section 19.8.2.202 - PROCEDURES
Current through Register Vol. 35, No. 24, December 23, 2024
A. Upon receipt of a complete application for a surface coal mining and reclamation operations permit, the director shall review the application to determine whether surface coal mining operations are limited or prohibited under 19.8.2.201 NMAC on the lands which would be disturbed by the proposed operation.
B. The director must reject any portion of the application that would locate surface coal mining operations on land protected under 19.8.2.201 NMAC unless:
C. If the director is unable to determine whether the proposed operation is located within the boundaries of any of the lands listed in Subsection F of 19.8.2.201 NMAC or closer than the limits provided in Subsections D and E of 19.8.2.201 NMAC, the director shall transmit a copy of the relevant portions of the permit application to the appropriate federal, state or local government agency for a determination or clarification of the relevant boundaries or distances, with a notice to the appropriate agency that it has 30 days from receipt of the request in which to respond. The national park service or the U.S. fish and wildlife service shall be notified of any request for a determination of valid existing rights pertaining to areas within the boundaries of areas under their jurisdiction and shall have 30 days from receipt of the notification in which to respond. The director, upon request by the appropriate agency, shall grant an extension to the 30-day period of an additional 30 days. If no response is received within 30-day period or within the extended period granted, the director may make the necessary determination based on the information he has available.
D. Where the proposed mining operation is to be conducted within 100 feet measured horizontally of the outside right-of-way line of any public road (except where mine access roads or haulage roads join such right-of-way line) or where the applicant proposes to relocate or close any public road, the director shall:
E. Where the proposed surface coal mining operations would be conducted within 300 feet measured horizontally of any occupied dwelling, the applicant shall submit with the application a written waiver from the owner of the dwelling, consenting to such operations within a closer distance of the dwelling as specified in the waiver. The waiver must clarify that the owner and signatory had the legal right to deny mining and knowingly waived that right.
F. Review by other agencies.
G. When a new surface coal mining operation or boundary revision for an existing surface coal mining operation is proposed that will include federal lands within a national forest, the director may not issue the permit or approve the boundary revision before the secretary of the interior makes a finding based on information submitted pursuant to 30 CFR Part 761.13.
H. If the director determines that the proposed surface coal mining operation is not prohibited under Section 69-25A-26 NMSA 1978 of the act, and this part, it may nevertheless, pursuant to appropriate petitions, designate such lands as unsuitable for all or certain types of surface coal mining operations pursuant to 19.8.3 and 19.8.4 NMAC.